Multi-section energy dissipation horizontal swing pier
A multi-stage, pier technology, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve problems such as bridge damage, achieve the effect of reducing friction and facilitating relative horizontal displacement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0027] A multi-stage energy-dissipating horizontal swing pier includes a support 1 and a pier body.
[0028] The pier body includes a supporting pier 3 and several segmented pier 2, both of which are hollow structures. Wherein the length of the supporting pier 3 is much longer than that of the segmented pier 2, and the segmented pier 2 consists of four pieces, and the lowermost segmented pier 2 is fixedly connected with the supporting pier 3. The upper end of the segmented bridge pier 2 is provided with a circular ladder groove 4, and the lower end of the segmented bridge pier 2 is integrally formed with a cylindrical stop cylinder 5, the diameter of the limit tube 5 is smaller than the inner diameter of the circular ladder groove 4, and several segmented bridge piers 2 overlap up and down, and the uppermost segmented pier 2 can support the bearing 1. The bottom of the circular ladder groove 4 is provided with a cavity 6, the bottom of the cavity 6 is fixedly provided with an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com