Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Shale gas well dynamic production allocation method

A shale gas well and production proration technology, which is applied in earthwork drilling, wellbore/well components, special data processing applications, etc., can solve problems such as low production proration efficiency and complex production proration process, and achieve rapid production proration Effect

Active Publication Date: 2020-11-10
SOUTHWEST PETROLEUM UNIV
View PDF13 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, in the shale gas production site and production stage, it is often necessary to rapidly prorate the production of shale gas wells. Although the production proration method mentioned above can meet the production requirements, it can only give proration for the current production data. Or it is necessary to carry out calculations for a specific moment multiple times, the production allocation process is still complicated, and the production allocation efficiency is still low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shale gas well dynamic production allocation method
  • Shale gas well dynamic production allocation method
  • Shale gas well dynamic production allocation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0032] A method for dynamic production allocation of shale gas wells, the steps are as follows:

[0033] The obtained relevant parameters of a shale gas well are shown in Table 1.

[0034] Table 1. Parameters of a certain shale gas well

[0035]

[0036] Step 1. Construct the single well material balance equation of shale gas well, where:

[0037] When the adsorbed gas is not desorbed, the mass balance equation is shown in formula (I);

[0038]

[0039] When the adsorbed gas is desorbed, the mass balance equation is shown in formula (II);

[0040]

[0041] In formula (I) and formula (II):

[0042] G m Indicates the surface free gas volume of the shale gas reservoir matrix, G f Indicates the surface free gas volume of fractured shale gas reservoirs, B gi Indicates the original volume factor of shale gas, C w Indicates the groundwater compressibility coefficient of shale gas reservoirs, C m Indicates the shale matrix compressibility coefficient, R si Indicates ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a shale gas well dynamic production allocation method. The shale gas well dynamic production allocation method comprises the steps of step 1, constructing a shale gas well single well material balance equation; step 2, establishing a single-well actual material balance equation in combination with the step 1 according to actual shale gas well related reservoir properties, and establishing a relation function about accumulated gas production and formation pressure; step 3, calculating the accumulated gas production according to the current formation pressure; step 4, establishing a binomial productivity equation through productivity well testing, and performing production allocation according to unchoked flow; step 5, drawing a plate of the accumulated gas production,the formation pressure and the single well production allocation according to the production allocation result obtained in the step 4; and step 6, according to different oil deposit accumulated gas production of a shale gas well, searching the obtained plate for production allocation. By the adoption of the scheme, rapid production allocation can be achieved, in the gas well production process, the reasonable production allocation can be rapidly determined by searching the plate according to the current accumulated gas production of the gas well, time factors do not need to be considered in the production allocation process, and the method is very convenient, efficient and practical.

Description

technical field [0001] The invention belongs to the technical field of shale gas exploration and development, and in particular relates to a method for dynamic production allocation of shale gas wells. Background technique [0002] In the process of shale gas exploration and development, conventional shale gas production allocation methods (such as decline curve analysis method) have large prediction errors and the production allocation process is complicated. [0003] In addition, the document CN104948163B discloses a method for measuring the productivity of shale gas wells. The steps include: testing, collecting and setting gas reservoir engineering parameters, and establishing the gas well productivity equation; The material balance equation of the shale gas reservoir in the fractured stimulation area; according to the gas well productivity equation, calculate the initial production of the gas well at the initial time; set the time step, calculate the time corresponding t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/00E21B49/00G06F30/20G06F17/10
CPCE21B43/00E21B49/00G06F30/20G06F17/10E21B43/25E21B43/16E21B2200/20E21B2200/22E21B43/26E21B47/06E21B49/006E21B49/008
Inventor 胡书勇邱婷婷张博宁
Owner SOUTHWEST PETROLEUM UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products