Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Pre-buried point hanging type mounting structure of assembly type wallboard

An installation structure and prefabricated technology, which is applied in building construction, covering/lining, construction, etc., can solve the problems of constant replacement, poor flatness, poor construction efficiency, etc.

Pending Publication Date: 2020-10-30
GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of this, the present invention provides a pre-embedded point-hanging installation structure of an assembled wallboard, which is used to solve the problem of poor flatness, poor construction efficiency, and poor installation quality caused by traditional wallboards having a large width and being installed from both sides. Poor as well as replacement constant technical issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-buried point hanging type mounting structure of assembly type wallboard
  • Pre-buried point hanging type mounting structure of assembly type wallboard
  • Pre-buried point hanging type mounting structure of assembly type wallboard

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] see Figure 1 to Figure 2 , the figure shows a pre-embedded point-mounted installation structure of a prefabricated wall panel provided by Embodiment 1 of the present invention, including: a wall panel 1; a connector 2, which is embedded on the reverse side of the wall panel 1; a keel 3 , which is fixedly connected to the wall body 5; the hook 4, whose inner side is connected with the top of the keel 3, and whose outer side is threadedly connected with the connector 2. Wherein, the connecting piece 2 is a connecting nut.

[0036] The pre-embedded point-hanging installation structure of the prefabricated wallboard provided in this embodiment includes the main wallboard 1, the connection 2 pieces, the keel 3 and the hanging piece 4, the keel 3 is fixedly connected to the wall body 5, and the connecting piece 2 is pre-embedded on the opposite side of the wallboard 1, and the wallboard 1 is connected with the hooking piece 4 through the connecting piece 2.

[0037] During...

Embodiment 2

[0044] see Figure 3 to Figure 4 , the figure shows a pre-embedded point-mounted installation structure of a prefabricated wall panel provided by Embodiment 2 of the present invention. On the basis of the above-mentioned embodiments, this embodiment further makes the following improved technologies Solution: the back of the wallboard 1 is provided with an installation hole 11, and the connector 2 is arranged in the installation hole 11; the depth of the installation hole 11 is consistent with the thickness of the connector 2. Through the setting of the above structure, the quick connection between the wall panel 1 and the hook 4 can be facilitated, and the flatness of the wall panel 1 can be improved at the same time.

Embodiment 3

[0046] see figure 2 , Figure 6 , the figure shows a pre-embedded point-mounted installation structure of a prefabricated wallboard provided by Embodiment 3 of the present invention. On the basis of the above-mentioned embodiments, this embodiment further makes the following improved technologies Solution: the hitch 4 includes a hitch plate 41 and a connecting column 42, the connecting post 42 is arranged on one side of the hitch plate 41, and both are perpendicular; the top of the connecting post 42 is provided with a threaded head 43, and the threaded head 43 is connected to the connecting nuts. Through the setting of the above structure, the threaded head 4 is directly connected with the connecting nut, which not only has good connection strength, but also is fast and convenient to connect.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a pre-buried point hanging type mounting structure of an assembly type wallboard. The pre-buried point hanging type mounting structure comprises a wallboard, a connecting piece,a keel and a hanging piece, the connecting piece is pre-embedded in the reverse side of the wallboard; the keel is fixedly connected with the wall body; and the inner side of the hanging piece is hung with the top of the keel, and the outer side of the hanging piece is in threaded connection with the connecting piece. Compared with the prior art, the mounting structure has the advantages of beingsimple in structure, convenient to install, capable of improving construction efficiency and installation quality, convenient to disassemble and assemble, free of damage to an original structure andconvenient to replace.

Description

technical field [0001] The invention relates to a wall panel installation structure, in particular to a pre-embedded point-hanging installation structure of an assembled wall panel. Background technique [0002] Prefabricated decoration is a new form of decoration construction in recent years. As the name implies, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for assembly and installation, eliminating the need for traditional decoration on-site measurement and cutting of various parts and components. The construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful, and will not produce too much decoration material waste. It is a more green and environmentally friendly form of decoration construction. [0003] In the prior art, when ins...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04F13/22E04F13/24
CPCE04F13/0803E04F13/0816
Inventor 何志伟于利凯迟玉华
Owner GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products