Overhaul plan making method and system for power transmission equipment
A technology for maintenance planning and power transmission equipment, applied in the field of automation, can solve problems such as inaccurate calculation of maintenance planning results, and achieve the effects of good global search capability, high computing efficiency, and good convergence characteristics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] Embodiment 1: as figure 1 As shown, the present invention provides a maintenance plan formulation method for power transmission equipment, including
[0064] S1 Obtain the construction period of each power transmission equipment and the power outage window period that can be arranged for maintenance;
[0065] S2 Bring the construction period of each power transmission equipment and the blackout window period that can be arranged for maintenance into the pre-built maintenance plan optimization model, and use the improved gravitational search algorithm to calculate, and obtain the maintenance time of each equipment;
[0066] S3 formulating a maintenance plan based on the maintenance time of each device;
[0067] The maintenance plan optimization model aims at the minimum power generation of abandoned renewable energy sources and the minimum distribution variance of the maintenance quantity, and is constructed with the grid's maintenance time requirements for each equipme...
Embodiment 2
[0151] Embodiment 2: Based on the same inventive concept, the present invention also provides a maintenance plan formulation system for power transmission equipment, including:
[0152] The obtaining module is used to obtain the construction period of each power transmission equipment and the power outage window period for arranging maintenance;
[0153] The calculation module is used to bring the construction period of each power transmission equipment and the power outage window period that can be arranged for maintenance into the pre-built maintenance plan optimization model, and use the improved gravitational search algorithm to perform calculations to obtain the maintenance time of each equipment;
[0154] Developing a module for formulating a maintenance plan based on the maintenance time of each device;
[0155] The maintenance plan optimization model aims at the minimum power generation of abandoned renewable energy sources and the minimum distribution variance of the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com