Variable-stage gradual optimization based joint optimization scheduling method for cascaded hydropower stations
A technology for joint optimization and cascade power plants, applied in data processing applications, forecasting, instruments, etc., to achieve the effect of improving solution efficiency, overcoming local convergence problems, and improving global search capabilities
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute a conflict with each other.
[0022] The present invention takes Xiluodu Xiangjiaba cascade hydropower stations in the lower reaches of the Jinsha River as an example, and conducts medium- and long-term optimal dispatch simulations for many years to reflect the effectiveness and rationality of the present invention.
[0023] Xiluodu and Xiangjiaba are cascade hydropower stations built and put into operation among the four ca...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com