An Analysis Method for Improving DC Power Receiving Capability for DC Weak Receiver Power Grid
A technology of power receiving capacity and analysis method, which is applied in the direction of AC network circuit, power transmission AC network, AC network voltage adjustment, etc., can solve the problems of untargeted and unconsidered influence of load power factor power receiving capacity, etc., and achieve the solution Reasonable, practical value, high practical value effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] refer to figure 1 , a preferred embodiment of the present invention, an analysis method for improving the DC power receiving capacity of the DC weak receiving end power grid, the method includes the following steps:
[0024] Step 1: Use PSD-BPA software to establish a power grid simulation data model corresponding to the typical summer small mode of the research level year. In the mode, arrange the hydropower generation of the sending end grid, and the UHV DC meets the full delivery conditions;
[0025] Step 2: Comprehensively consider the short-circuit ratio of the DC weak receiving end feeding system, peak shaving capability, standby capacity, N-1 static safety, N-1 transient stability, severe fault transient stability, AC-DC channel coupling characteristics, The influence factors of load model, load power factor, reactive power compensation equipment operation mode and DC control mode give the DC access capability of the receiving end grid;
[0026] Step 3: Accordin...
Embodiment 2
[0039] Taking Jiangxi Power Grid as the research object power grid, establish a national power grid in the summer of 2022. Among them, Sichuan Power Grid will generate a lot of hydropower. In the typical small mode in Jiangxi in the summer of 2022, Jiangxi Power Grid starts up with an output of 7800MW, the total reactive power of generation is 3956MW, and the total load of the province is 15600MW. Connection line situation: 500kV of Hubei power grid sends about 6300MW to Jiangxi, UHV sends about -320MW to Jiangxi; Hunan power grid UHV sends Jiangxi to -90MW; The eastern part is about 1420MW; the power flow analysis shows that there is a 1000 / 500 / 220kV three-level electromagnetic ring network in the load center of Jiangxi Power Grid, and the area near the UHV DC inverter station is a weak area. By adjusting the start-up mode of Fengcheng Power Plant in Central Jiangxi Power Grid, the Alleviate the electromagnetic ring network problem.
[0040] Calculate Yazhong-Nanchang UHV DC...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com