Construction method of equipment foundation anchor bolt preformed hole and application structure of equipment foundation anchor bolt preformed hole

An anchor bolt and equipment foundation technology, which is applied to the construction method of reserved holes for equipment foundation anchor bolts and the application structure field, can solve the problems of poor forming quality, inconvenient installation, and great dismantling damage, and achieves good forming quality. , saving construction costs, and the effect of wide selection of materials

Pending Publication Date: 2020-08-11
CHINA CHENGDA ENG
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above-mentioned technical problems, the purpose of the present invention is to provide a construction method for the reserved holes of the foundation bolts of the equipment foundation. The formwork support method has technical defects such as inconvenient installation, high demolition destructiveness, and poor molding quality. The construction method using threaded rods is simple and quick, with a wide range of materials and easy access. It is safe and reliable in construction applications, and the molding quality is good. After the second grouting The effect is better, and the threaded rod after one construction can be reused, saving cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of equipment foundation anchor bolt preformed hole and application structure of equipment foundation anchor bolt preformed hole
  • Construction method of equipment foundation anchor bolt preformed hole and application structure of equipment foundation anchor bolt preformed hole
  • Construction method of equipment foundation anchor bolt preformed hole and application structure of equipment foundation anchor bolt preformed hole

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047]All features disclosed in this specification, or steps in all methods or processes disclosed, may be combined in any manner, except for mutually exclusive features and / or steps.

[0048] Any feature disclosed in this specification (including any appended claims, abstract), unless otherwise stated, may be replaced by alternative features which are equivalent or serve a similar purpose. That is, unless expressly stated otherwise, each feature is one example only of a series of equivalent or similar features.

[0049] The embodiment is basically as figure 1 As shown: this embodiment provides a construction method for the reserved holes for the foundation bolts of the equipment foundation, which is applied to the formwork support link in the construction of the equipment foundation; the construction method includes the following steps:

[0050] Step 1, the preparation process of the threaded rod and the threaded rod fixing frame: including the selection of the threaded rod ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of an equipment foundation anchor bolt preformed hole and an application structure of the equipment foundation anchor bolt preformed hole and relates to the technical field of petrochemical engineering construction. The construction method comprises the preparation procedure of threaded rods and a threaded rod fixing frame and the construction procedure for applying the threaded rods. The construction procedure for applying the threaded rods comprises the steps of arranging the threaded rods, fixing the threaded rods, adjusting the embedding depthof the threaded rods, checking the threaded rods, wetting the surfaces of the threaded rods, pouring concrete of the equipment foundation, taking out the threaded rods and clearing the anchor bolt preformed holes. By the adoption of the technical scheme, the anchor bolt preformed holes of the equipment foundation are constructed through the threaded rods, so that the technical defects that by theadoption of a temporary wood formwork supporting method, installation is inconvenient, the detachment destructiveness is large, and the formation quality is poor are overcome; the construction methodwith the threaded rods is simple and rapid, the material selection range is wide, the materials are easy to obtain, the construction method is safe and reliable in construction application, and the formation quality is good; and the threaded rods can be repeatedly used after construction is performed once, so that cost is saved.

Description

technical field [0001] The invention relates to the technical field of petrochemical engineering construction, in particular to a construction method and an application structure for reserved holes for anchor bolts of equipment foundations. Background technique [0002] In the construction of petrochemical engineering projects, a large number of equipment foundations (civil works) need to be constructed. Generally, it is necessary to reserve equipment anchor bolt holes during concrete foundation construction. The traditional construction method is: use wooden templates on site to make molds for the holes reserved for anchor bolts, pre-bury them before pouring concrete, and break them out after the concrete solidifies. [0003] However, in the process of implementing the embodiments of the present invention, the inventors of the present application found that the traditional construction method has at least the following technical problems: ① There are many reserved holes for...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/44
CPCE02D27/44
Inventor 胡爱新李洪杰王晓页陆吉耀
Owner CHINA CHENGDA ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products