Turnout rapid construction apparatus and method during existing station transformation
A technology for existing stations and construction devices, applied to roads, tracks, laying tracks, etc., can solve the problems of difficult pre-paved sites for turnouts, short key points, and limited boundaries, so as to reduce maintenance workload, speed up conversion progress, and realize mechanized effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] In this embodiment, the reconstruction of a group of turnouts in the south throat area of the railway station in Nanyang City, Henan Province is taken as an example. Figure 1-29 As shown in the figure, "N" represents a new turnout, and "(10)" represents an existing turnout; in this embodiment, it is mainly the construction method of No. N8 turnout; N6, N10, N12, N18, N20, N22, and N24 are all A new turnout was laid for the station renovation, and the construction time was earlier than the N8 turnout.
[0064] This embodiment provides a rapid construction device for a turnout when an existing station is being renovated, including a pre-paved platform, a lifting device, a running device and a traction device; a turnout sleeper is pre-laid on the pre-paved platform for laying a turnout; the lifting device It is fixed on the rail of the turnout and is used to drive the turnout to go up and down; the running device is used to realize the lateral movement and the longitudi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com