Variable-width platform device for quickly constructing hydraulic climbing formwork of double-limb cable bent tower and construction method
A technology of hydraulic climbing formwork and platform device, which is applied in the direction of erecting/assembling bridges, bridge parts, bridges, etc., and can solve problems such as low efficiency, long construction period, and high safety risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] see Figure 1-5 , a widening platform device of hydraulic climbing formwork for fast construction of double-leg cable towers, which includes embedded parts 6, on which a wall attachment device 10 is fixedly installed, and the outer wall of the wall attachment device 10 is fixed A vertical guide rail 11 is installed, and a hydraulic formwork climbing device 13 is installed on the vertical guide rail 11. The top of the hydraulic formwork climbing device 13 is fixedly equipped with an operating platform 9, and the top of the operating platform 9 passes through a lateral sliding device. 8 is equipped with a formwork system 5, and the formwork system 5 is connected to the formwork system on the other side of the double-leg pylon on the tower column 14 on the side where the formwork system 5 is located through a spacing adjustment device. By adopting the variable width platform device of the above structure, it can be used for the pouring construction of the double-leg cable ...
Embodiment 2
[0047] The method for double-leg cable tower construction of the widening platform device of the hydraulic climbing formwork of the rapid construction double-leg cable tower includes the following steps:
[0048] Step 1, the wall attachment device 10 is fixedly installed on the embedded part 6 on the poured cable tower 15, and the vertical guide rail 11 is installed on the wall attachment device 10, and the hydraulic climbing formwork device 13 is slid on the vertical guide rail 11;
[0049] Step 2, support and install the steel bar binding platform 1 on the top of the hydraulic formwork climbing device 13 located outside the cable tower 15, support and install the formwork system 5 on the top of the hydraulic formwork climbing device 13 located inside the cable tower 15, where the formwork system 5 is located The other end of 14 is connected to the tower column 14 of the cable tower 15 on the other side through the double-V linkage device 3 and multiple sets of row pin hole sl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com