Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Cutter scheduling method based on improved particle swarm algorithm

A technology for improving particle swarms and cutting tools, applied in computing, computing models, manufacturing computing systems, etc.

Active Publication Date: 2020-06-26
ZHONGBEI UNIV +1
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Aiming at the problem of affecting the normal production caused by the unsatisfied needs of cutting tools, a production job scheduling model considering tool inventory constraints was established and an improved particle swarm optimization algorithm was designed to solve it. tool conflicts, and achieve the optimization goal of minimizing the maximum completion time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cutter scheduling method based on improved particle swarm algorithm
  • Cutter scheduling method based on improved particle swarm algorithm
  • Cutter scheduling method based on improved particle swarm algorithm

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0091] The tool scheduling method based on the improved particle swarm optimization algorithm of the present invention will be further described below in conjunction with the drawings and embodiments, and the present invention includes but not limited to the following embodiments. Such as figure 1 As shown, the algorithm provided by the present invention mainly includes building a production job scheduling model considering the tool inventory constraints, and then using the improved particle swarm optimization algorithm to analyze the tool scheduling plan. The specific process is as follows:

[0092] 1. Build a production job scheduling model considering tool inventory constraints

[0093] (1) Process parameters and tool inventory of the workpiece.

[0094] The scientificity and effectiveness of the production job scheduling model considering tool inventory constraints and its solution algorithm are verified by collecting the actual data of a certain day's production job sche...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a cutter scheduling method based on an improved particle swarm algorithm. The problem that normal production is affected due to the fact that the requirements of cutters cannot be met is solved. According to the method, a production job scheduling model considering tool inventory constraints is established, an improved particle swarm algorithm is designed for solving, tooluse conflicts between procedures are solved by rescheduling the procedures in production jobs, and the optimization goal of minimizing the maximum completion time is achieved. Firstly, on the basis of a particle swarm algorithm, a proper encoding and decoding mode is designed according to a manufacturing workshop production operation scheduling problem, operations such as speed addition and dislocation subtraction are designed on the basis to update particle positions and speeds, and algorithm parameters such as dynamic inertia weight and the like are supplemented to form an improved particleswarm algorithm, so that the search capability of the algorithm is enhanced; and then, the model instance is stimulated according to the process parameters of the workpiece and the prop inventory information, and the reliability and effectiveness of the model and the algorithm are verified.

Description

technical field [0001] The invention relates to the field of cutting tool scheduling in a production workshop, in particular to a method for scheduling cutting tools in a production workshop based on a particle swarm algorithm. Background technique [0002] The workshop production scheduling system is one of the most important contents in the advanced manufacturing system. It plays a very important role in optimizing the utilization of resources, improving work efficiency and saving costs. With the rapid development of the economy, the competition among manufacturing enterprises is becoming more and more fierce, and the manufacturing enterprises are also paying more and more attention to improving the competitiveness of enterprises through efficient workshop production scheduling systems. [0003] At present, the planning department of discrete manufacturing enterprises does not consider the available inventory constraints of tools when scheduling production. During the prod...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/04G06N3/00
CPCG06Q10/06315G06Q10/06316G06Q10/06312G06Q50/04G06N3/006Y02P90/30
Inventor 刘书麟张维吴燕杨洋洋
Owner ZHONGBEI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products