A method for dismantling an inverted arch
A technology of arch surface and blast hole, applied in the field of inverted arch demolition, can solve the problems of increasing construction cost and slowing down construction progress, and achieve the effect of speeding up construction progress, reducing demolition cost and reconstruction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as Figure 1-Figure 3 Shown, a kind of inverted arch removal method comprises the following steps:
[0032] Step 1: Level the surface of the inverted arch 1 to be removed.
[0033] Step 2: a plurality of first blastholes 31 are arranged perpendicular to the inverted arch surface 11, and the first blastholes 31 are arranged along the transverse direction of the tunnel and the longitudinal direction of the tunnel to form 12 arrays of first blastholes arranged longitudinally along the tunnel. The depth of the first blasthole 31 is 10-20cm greater than the depth of the inverted arch 1, and the detonator 5 is arranged in the first blasthole 31;
[0034] A plurality of hollow holes 4 are arranged perpendicular to the inverted arch surface 11, and the plurality of hollow holes 4 are arranged longitudinally along the tunnel to form a hollow hole arrangement, and the hollow hole arrangement is arranged on the longitudinal axis of the tunnel;
[0035] A plurality of second...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com