Intelligent substation maintenance safety measure execution state checking method and device
A smart substation and execution status technology, applied in other database retrieval, data processing applications, instruments, etc., can solve the problems of not being able to adapt to the operation and maintenance habits of different regions, not being able to check the relationship between safety measures, and lacking effective management and control methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] A method for checking the implementation status of maintenance safety measures in intelligent substations, comprising:
[0056] Obtain the status information of the primary switch, knife switch, grounding wire of the smart substation, as well as the operation status information of the relay protection equipment and the status information of the soft and hard pressure plates;
[0057] According to the status analysis of the primary switch, knife switch and grounding wire of the smart substation, the actual primary interval status is obtained; according to the operation status information of the relay protection equipment and the status information of the soft and hard pressure plate, the actual secondary equipment status of the relay protection equipment is obtained;
[0058] Obtaining safety measures for the actual maintenance work scene of the smart substation requires obtaining safety measures tasks;
[0059] According to the security task, combined with the pre-built...
Embodiment 2
[0084] Such as figure 2 As shown, a smart substation maintenance safety measure implementation status checking device includes:
[0085] The acquisition module is used to: acquire the status of the primary switch, switch, and grounding wire of the smart substation, as well as the operation status information of the relay protection equipment and the status information of the soft and hard pressure plates; acquire the safety measures of the actual maintenance work scene of the smart substation and obtain the safety measures task ;
[0086] The analysis module is used to: obtain the actual primary interval state according to the state analysis of the primary switch, switch, and ground wire of the smart substation; obtain the actual secondary interval state of the relay protection device according to the operation state information of the relay protection device and the state information of the soft and hard pressure plate. device status;
[0087] According to the security tas...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com