Optimal scheduling method, system and equipment for distributed new energy power distribution network
A distributed new energy, optimized scheduling technology, applied in the direction of single-network parallel feed arrangement, etc., can solve the problem of lack of uncertainty in new energy output, achieve the effect of simplifying the solution process and improving computing efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] see figure 1 , figure 1 It is a method flowchart of an optimal dispatching method, system and equipment for a distributed new energy distribution network provided by an embodiment of the present invention.
[0048] An optimal scheduling method for a distributed new energy distribution network provided by the present invention includes the following steps:
[0049] Step S1: Obtain the relevant parameters of the existing power system to prepare for the establishment of the model in the subsequent steps;
[0050] Step S2: Based on the relevant parameters of the power system, establish a two-layer model for optimal dispatching of the power grid based on the uncertainty of distributed new energy output, and convert the two-layer model into a single-layer linear model; convert the two-layer model into a single-layer linear model, Therefore, the solution of the double-layer model is converted into the solution of the single-layer model, which simplifies the solution process ...
Embodiment 2
[0096] In this embodiment, optimal scheduling is performed on the improved ieee33 node distribution network system. The structure of the distribution network is shown in the appendix Figure 4 . exist Figure 4 In the power distribution system of , nodes 13 and 21 contain wind power equipment with an installed capacity of 96MW. Node 25 contains photovoltaic equipment with an installed capacity of 50MW. Node 22 and node 32 contain traditional distributed power sources, which are coal-fired units. Node 1 is connected to the main grid. Through node 1, the distribution network can purchase or sell electricity with the main grid.
[0097] Applying the algorithm of the embodiment of the present invention, firstly, the electricity price of the main network in the electricity market and the new energy penalty electricity price (20$ / MW) are determined during the scheduling period. The main grid electricity price within 24 hours is as follows:
[0098]
[0099] The uncertainty ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com