Optimization scheduling method for comprehensive energy system of smart park on basis of multiple objectives

A technology for integrated energy system and optimized scheduling, applied in the field of integrated energy system, can solve problems such as low work efficiency, unconsidered, large errors, etc.

Pending Publication Date: 2020-04-10
JIANGSU FRONTIER ELECTRIC TECH +2
View PDF3 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, further attention needs to be paid to the fact that the response characteristics of electricity, heat, and gas multi-energy are different on the time scale, so it is often not considered or cannot be integrated and To overcome the difference in the time scale of the corresponding characteristics of electric heat and gas, the integrated energy system scheduling cannot play its role to the greatest extent, the error is large, and the work efficiency is low. The difference in the time scale of different response characteristics becomes very important

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimization scheduling method for comprehensive energy system of smart park on basis of multiple objectives
  • Optimization scheduling method for comprehensive energy system of smart park on basis of multiple objectives
  • Optimization scheduling method for comprehensive energy system of smart park on basis of multiple objectives

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0095] The present invention will be described in detail below with reference to the accompanying drawings and embodiments.

[0096] This embodiment is applied in an integrated energy system, and the structure of the integrated energy system is as follows figure 1 shown.

[0097] A multi-objective-based optimal scheduling method for the integrated energy system of a smart park, comprising the following steps:

[0098] Step S1, obtain the basic operating parameters of the integrated energy system. The basic parameters in this embodiment include renewable energy sources such as photovoltaics and wind power, as well as the intraday forecast output of cooling, heating and electric loads, micro-combustion engines, electric boilers, fuel cells, absorption The capacity and climbing constraints of type refrigerators, electric refrigerators, batteries, heat storage tanks, cold storage tanks and other equipment, the interactive power constraints of the upper power grid connection line,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an optimization scheduling method for a comprehensive energy system of a smart park on basis of multiple objectives. The optimization scheduling method comprises the followingsteps: determining and acquiring basic operation parameters of the comprehensive energy system; formulating evaluation indexes of multi-objective operation of the smart park; establishing an optimization scheduling model of a day-ahead economic scheduling stage of the comprehensive energy system; and solving the established multi-objective optimization scheduling model by adopting a mixed linear integer programming solver. According to the invention, through construction of a target function with minimized operation cost in a scheduling stage, on the basis of meeting power balance and safety constraints, evaluation indexes and constraint conditions are established from the perspectives of energy consumption, environmental protection and reliability; starting, stopping and output states ofenergy storage, flexible load and combined heat and power supply controllable units in the system are optimized; and multi-objective optimization scheduling of the comprehensive energy system of the smart park is realized. Thus, economic and environment-friendly operation of the system can be achieved; various energy supply reliability of the system can be guaranteed; and safe, stable, efficient and economical operation of the comprehensive energy system is guaranteed.

Description

[0001] Field [0002] The invention belongs to the field of integrated energy systems, and in particular relates to a multi-objective-based optimal scheduling method for an integrated energy system in a smart park. Background technique [0003] Energy is the foundation of human survival and development. The traditional energy system construction tends to plan, design and operate independently for each subsystem. There are differences and barriers in the development of different energy supply systems, and the coupling degree of multi-energy systems such as electricity, heat and gas is different. High, the lack of multi-energy complementarity and coordinated control mechanisms among them may lead to problems such as low energy utilization efficiency, insufficient system operation safety, and lack of system self-healing ability under failure conditions. [0004] In recent years, energy technologies such as distributed power generation, renewable energy, cogeneration, micro-grid, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/18G06Q10/04G06Q10/06G06Q50/06
CPCG06F17/18G06Q10/04G06Q10/0631G06Q10/0639G06Q50/06Y02P80/10Y02P90/82
Inventor 方超杜先波仲春林唐一铭李叶飞王灿王子涵徐小冬陈复兴赵芮石林郑安宁张凡王琦陶苏朦汤奕
Owner JIANGSU FRONTIER ELECTRIC TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products