Resource scheduling method, base station and computer storage medium
A resource scheduling and base station technology, applied in the communication field, can solve problems such as limited CCE resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] An embodiment of the present invention provides a resource scheduling method, figure 1 Schematic diagram of the implementation process of a resource scheduling method proposed for the embodiment of the present invention Figure 1 ,Such as figure 1 As shown, in the embodiment of the present invention, the method for the base station to perform resource scheduling may include the following steps:
[0054] Step 101. Determine an active beam corresponding to a terminal to be scheduled from preset beams; wherein, the terminal to be scheduled is a terminal with the highest scheduling priority that has not performed resource scheduling among multiple terminals.
[0055] In the embodiment of the present invention, the base station may first determine the active beam corresponding to the terminal to be scheduled from preset beams. Wherein, the preset beams are obtained by uniformly dividing the DOA range covered by the cell by the scheduler of the base station, and each preset...
Embodiment 2
[0082] figure 2 Schematic diagram of the implementation process of a resource scheduling method proposed for the embodiment of the present invention Figure II ,Such as figure 2 As shown, based on Embodiment 1, in the embodiment of the present invention, further, the above-mentioned base station, according to the aggregation level corresponding to the terminal to be scheduled, the active beam, the pre-stored CCE starting position set corresponding to the active beam, and The method for obtaining the scheduling parameter corresponding to the terminal to be scheduled from the pre-stored available CCE set corresponding to the activated beam may include the following steps:
[0083] Step 102a, acquiring the initial CCE position corresponding to the terminal to be scheduled.
[0084] In the embodiment of the present invention, after the base station determines the active beam corresponding to the terminal to be scheduled from the preset beams, it may first acquire the initial C...
Embodiment 3
[0102] Figure 4 Schematic diagram of the implementation process of a resource scheduling method proposed for the embodiment of the present invention Figure four ,Such as Figure 4 As shown, based on the first embodiment, in the embodiment of the present invention, further, before the above-mentioned base station determines the active beam corresponding to the terminal to be scheduled from the preset beams, that is, before step 101, the resource scheduling method of the above-mentioned base station is further Can include the following steps:
[0103] Step 106: Carry out beam division according to the departure angle ranges corresponding to multiple terminals, and obtain preset beams.
[0104]In an embodiment of the present invention, before the above-mentioned base station determines the above-mentioned activated beam corresponding to the above-mentioned terminal to be scheduled from the above-mentioned preset beam, it needs to perform beam division according to the departu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com