Node delivery method and device, electronic equipment and storage medium
An electronic device and node technology, applied in the field of cloud computing, can solve the problems of unstable operation of various services in the data center and low utilization of node resources, so as to achieve the effect of improving resource utilization and ensuring resource demand
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] figure 1 A schematic diagram of a node delivery process provided by an embodiment of the present invention, the process includes:
[0051] S101: Obtain the first resource scheduling increment of each type of node in each sub-period in the current delivery period.
[0052] The node delivery method provided by the embodiments of the present invention is applied to electronic devices, which may be devices such as tablet computers, personal computers, and physical servers, or physical server clusters or data centers composed of multiple physical servers.
[0053] In the embodiment of the present invention, a delivery cycle and a sub-cycle are preset, wherein the duration corresponding to the sub-cycle is not greater than the duration corresponding to the delivery cycle, for example: the duration corresponding to the delivery cycle is 30 days, and the duration corresponding to the sub-cycle is 1 day . In addition, in the embodiment of the present invention, various types o...
Embodiment 2
[0061] In the embodiment of the present invention, the delivery model is obtained according to the second resource scheduling increment of each type of node in each delivery period in the training set in each sub-period and the second amount of corresponding delivery in the next delivery period. In the embodiment of the present invention, for each type of nodes in the training set, in each delivery period, determine the second resource scheduling increment of each type of node in each sub-period in the delivery period, and determine the The second quantity delivered by the node in the next delivery period of the delivery period;
[0062] For each delivery period, input the second resource scheduling increment of each type of node in each sub-period in the delivery period, and the corresponding delivery second quantity in the next delivery period of the delivery period into the delivery model, for Deliver the model for training.
[0063] Specifically, the training set contains...
Embodiment 3
[0068] In order to ensure the accuracy of node delivery, on the basis of the above-mentioned embodiments, in the embodiment of the present invention, the delivery of various types of nodes in the next delivery cycle includes:
[0069] Each type of node is delivered at a set time within the next delivery period.
[0070] Specifically, in order to ensure the accuracy of node delivery, in the embodiment of the present invention, it is also possible to set the time for delivering each type of node in each delivery period, such as 00:00 on the fourth day of each delivery period as the delivery time etc.
[0071] In addition, in order to facilitate the acquisition of the first resource scheduling increment of each type of node in each sub-period in the current delivery period, the acquisition of the first resource scheduling increment of each type of node in each sub-period in the current delivery period includes:
[0072] Obtain task scheduling records of various types of nodes in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com