Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Timing control system for testing t-con boards

A timing control and control module technology, applied in general control systems, control/regulation systems, program control, etc., can solve problems such as insufficient compactness of the system, cumbersome process, and unstable testing

Active Publication Date: 2021-04-20
惠州高盛达光显技术有限公司
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing three modules need to carry out their own welding wires to achieve electrical connection. The process is cumbersome, and it is not enough to make the whole system not compact enough. Prone to the problem of low delay accuracy

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Timing control system for testing t-con boards
  • Timing control system for testing t-con boards
  • Timing control system for testing t-con boards

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the associated drawings. Preferred embodiments of the invention are shown in the accompanying drawings. However, the present invention can be embodied in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0026] It should be noted that when an element is referred to as being “fixed” to another element, it can be directly on the other element or there can also be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and similar expressions are used herein for purposes of ill...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a timing control system for testing a T-con board, which includes a power input module, a protection module, a delay module, a control module, a voltage conversion module and a button input module, and the output terminals of the power input module are respectively connected to the voltage conversion The input terminal of the module is electrically connected with the protection module, the output terminal of the protection module is electrically connected with the input terminal of the delay module, the output terminal of the delay module is used for output voltage, and the control module is respectively connected with the voltage conversion module, the key input module and the delay module. The modules are electrically connected. The invention is a timing control system for testing a T-con board. By arranging a protection module, a delay module and a control module on a circuit board, compared with the prior art, it is possible to avoid the occurrence of welding wires The problem is that the connection is simple and convenient, which makes the whole system compact; at the same time, it can also avoid interference caused by too long welding leads, improve the stability of the test, and then improve the accuracy of the test.

Description

technical field [0001] The invention relates to the field of T-con board testing, in particular to a timing control system for testing a T-con board. Background technique [0002] With the development of the times, optoelectronic technology is constantly updated, and various optoelectronic products spring up like bamboo shoots after a rain. As we all know, when some optoelectronic products are powered on, the main chip in the board needs to read the EEPROM data, and after reading, send it to the PWM power chip, such as CS601, SY7611 and other chips to configure the registers, so that they can output VGL, VGH, GAMMA, etc. This process is also the initialization process of PCBA. The whole process takes about 70ms to 80ms. The I2C bus is busy during the initialization process, so it is not allowed to be interfered by the outside world. If there is another signal input at this time It will cause program confusion, so that the initialization process of PCBA will fail, and the sy...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G05B19/042
CPCG05B19/0423G05B2219/25257
Inventor 李佳刚罗章
Owner 惠州高盛达光显技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products