An automatic test system for remote measurement accuracy of power system measurement and control devices

A technology of automatic test system and measurement and control device, which is applied in the direction of measuring device, electrical test/monitoring, general control system, etc., and can solve problems such as affecting test efficiency, consuming manpower, and not having the ability to test multiple devices together

Active Publication Date: 2022-04-12
XUCHANG KETOP DETECTION TECH CO LTD
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

To test the accuracy of telemetry, it is necessary to build a test system consisting of a relay protection tester, a measurement and control device, and a monitoring master station. Each part of the test system operates independently, and testers need to participate in the control of the relay protection tester and the reading of the monitoring master station. Data, test result calculation, etc., consume a lot of manpower
[0003] At present, the test method for the accuracy of measurement and control telemetry is generally to artificially connect the relay protection tester to the AC acquisition loop of the measurement and control device, and then control the relay protection tester to apply AC to the measurement and control device through the client software of the relay protection tester. The telemetry data sent by the device is read through the monitoring master station connected to the measurement and control device, and the corresponding data information is manually calculated. During the whole test, each test equipment is independent of each other, and human participation is required throughout the process, and the test results are calculated. The workload is heavy, the test efficiency is low, and the existing measuring and controlling instruments can only test one-to-one each time, and do not have the ability to test multiple devices together, which seriously affects the test efficiency.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An automatic test system for remote measurement accuracy of power system measurement and control devices

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] An automatic test system for remote measurement accuracy of power system measurement and control devices, such as figure 1 As shown, a command component 100 for connecting with a relay protection tester, a test configuration file library component 200, a simulation master station component 300 and a judging component 400 for connecting with a measurement and control device are provided;

[0026] As mentioned above, the command component 100 is connected with the simulation master station component 300, and the simulation master station component 300 is connected with the test configuration file library component 200 and the judgment component 400 respectively;

[0027] Specifically, the command component 100 issues a test command to the relay protection tester, and the relay protection tester sends the corresponding test data to the measurement and control device according to the test command, and the simulation master component 300 calls the test configuration file libr...

Embodiment 2

[0068] An automatic test system for telemetry accuracy of a power system measurement and control device, the other structures are the same as in Embodiment 1, the difference is that the telemetry accuracy automatic test system of a power system measurement and control device is also provided with a communication protocol analysis and conversion component 102, the communication protocol analysis and conversion The component 102 is connected to the command component 100 and the command interface 101 respectively.

[0069] Specifically, the communication protocol analysis conversion component 102 is configured as an RS232 serial communication protocol analysis or RS485 serial communication protocol analysis or RS422 serial communication protocol analysis component.

[0070] By setting the communication protocol analysis conversion component, the mutual communication efficiency between the system and the relay protection tester can be improved, and the stability of the system opera...

Embodiment 3

[0072] An automatic test system for telemetry accuracy of power system measurement and control devices, the other structures are the same as those in Embodiment 1 or 2, the difference is that, specifically, there are N test data feedback interfaces 402, N≥1, and N is a positive integer.

[0073] Specifically, the judging component 400 is provided with M sub-judging units 401, and the sub-judging units 401 are matched and connected with the simulation master station component 300 and the test data feedback interface 402 respectively, M≥1, and M is a positive integer.

[0074] In this embodiment, there are five test data feedback interfaces 402 and five sub-judgment units 401 respectively, which can increase the test effect of the system on the measurement and control device.

[0075] In the actual use process, the number of test data feedback interfaces and sub-judgment units can be adjusted in time, such as being set to 3, 6 or 7 at the same time, etc., and adjusted according t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

An automatic test system for telemetry accuracy of a power system measurement and control device, which is provided with a command component for connecting with a relay protection tester, a test configuration file library component, a simulation master station component and a judgment component for connecting with a measurement and control device, the command component and The simulation master station component is connected, the simulation master station component is connected with the test configuration file library component and the judgment component respectively, and the command component issues a test command to the relay protection tester, and the relay protection tester sends the corresponding test data to the measurement and control device according to the test command device, the simulation master component calls the data information of the corresponding test command from the test configuration file library component according to the test command to perform simulation calculation, and sends the calculation result to the judgment component, and the measurement and control device will The corresponding test data is sent to the judging component, and the judging component compares and judges the test data and the calculation results. The system can simultaneously test one or more measurement and control devices in real time by controlling the relay protection tester, and judge the test results of the measurement and control devices in real time, reducing the complexity of manual calculations.

Description

technical field [0001] The invention relates to the technical field of electric power system relay protection, in particular to an automatic test system for remote measurement precision of electric power system measurement and control devices. Background technique [0002] In the field of power system relay protection, the telemetry accuracy of measurement and control devices is an important indicator. To test the accuracy of telemetry, it is necessary to build a test system consisting of a relay protection tester, a measurement and control device, and a monitoring master station. Each part of the test system operates independently, and testers need to participate in the control of the relay protection tester and the reading of the monitoring master station. Data, test result calculation, etc., consume a lot of manpower. [0003] At present, the test method for the accuracy of measurement and control telemetry is generally to artificially connect the relay protection tester...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G05B23/02G01R35/00
CPCG05B23/0208G01R35/00
Inventor 王伟贺春李志勇李卫东庄良文陈新美周鹏鹏胡卫东任春梅侯明义王俊辉李嘉原晓磊刘韶婧赵广旭
Owner XUCHANG KETOP DETECTION TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products