Multi-voltage-level maintenance plan optimization method and device based on risk overlapping degree
A technology with multiple voltage levels and maintenance plans, applied in computing, instrumentation, data processing applications, etc., and can solve problems such as unconsidered risk overlap
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] Such as figure 1 As shown, in the technical solution of the present invention, a multi-voltage level maintenance plan optimization method based on risk overlap includes:
[0056] S1, define and construct the risk overlap index, and construct the objective function of maintenance plan optimization according to the risk overlap degree, power outage loss load caused by maintenance, and daily maintenance workload;
[0057] S2. Using the unchangeable maintenance application time, the simultaneity of maintenance work, the mutual exclusion of maintenance work, and safety check as constraints, the minimum value of the objective function is solved by artificial fish swarm algorithm.
[0058] Before the step S1, it also includes: establishing a characteristic data table through a relational database. The feature data table includes: power outage equipment data table, maintenance application form, power outage equipment impact object table, object power supply collection table, p...
Embodiment 2
[0098] like figure 2 As shown, step S2 in the multi-voltage level maintenance plan optimization method based on risk overlap in the present invention specifically includes:
[0099] S21, set the power outage start time variable of each maintenance application in the maintenance plan of the current month As an independent variable, using the unchangeable maintenance application time, the simultaneity of maintenance work, the mutual exclusion of maintenance work, and safety checks as constraints, set the perception distance ν, the maximum moving step size step, the congestion factor δ, and the maximum attempt times n try , the maximum number of iterations n Gen ;
[0100] S22, initialize the population and randomly generate N f artificial fish, that is, N f A maintenance plan arrangement scheme, calculate the food concentration of each artificial fish in the initial population, that is, the value of the objective function F, select the first minimum value of the objective...
Embodiment 3
[0116] like image 3 As shown, the present invention also provides a multi-voltage level maintenance plan optimization device based on risk overlap, including:
[0117] The definition and construction module 101 defines and constructs the risk overlap index, and constructs the objective function of the maintenance plan optimization according to the risk overlap degree, the power outage loss load caused by maintenance, and the daily maintenance workload;
[0118] The calculation and solving module 102 uses the unchangeable maintenance application time, the simultaneity of maintenance work, the mutual exclusion of maintenance work, and safety check as constraints, and solves the minimum value of the objective function through artificial fish swarm algorithm.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com