Uplink control information processing method and a terminal
An information processing method and a technology for controlling information, which are applied in the field of uplink control information processing methods and terminals, can solve the problems that a base station cannot instruct dynamic adjustment information, cannot judge whether a user terminal wants to send uplink data, and is difficult to adjust PUSCH, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0198] If time slot n is an uplink time slot configured by the base station for uplink transmission, and the user terminal has uplink data to be sent in time slot n, then the user terminal needs to determine whether there is an uplink data that may need to be sent in time slot n control information. If there is uplink control information, the user terminal judges according to predefined rules whether to send the PUSCH carrying uplink data on time slot n, and send all or part of the uplink control information on the PUSCH at the same time; or send only uplink data on time slot n data, but the PUSCH does not carry the uplink control information; or in time slot n, only the PUCCH carrying the uplink control information is sent, and the PUSCH for carrying at least the uplink data is not sent.
[0199] The PUSCH may be the PUSCH of the GF, or the PUSCH based on dynamic UL grant scheduling.
[0200] Sending PUSCH in time slot n may include at least one of the following two situatio...
Embodiment 2
[0302] If time slot n is an uplink time slot configured by the base station for GF uplink transmission, and the user terminal has uplink data to be sent in time slot n, then the user terminal needs to determine whether there is any data that may need to be sent in time slot n Uplink control information. If there is uplink control information, the user terminal judges according to the predefined rules whether to send the GF’s PUSCH to carry uplink data on time slot n, and send all or part of the uplink control information on the PUSCH at the same time; or send only PUSCH on time slot n Carrying uplink data without sending uplink control information; or sending only PUCCH to carry uplink control information on time slot n, without sending a PUSCH for carrying at least uplink data.
[0303] The predefined rule is to determine whether all or part of the control information can be sent on the PUSCH according to the predefined threshold and / or priority.
[0304] Among them, the pre...
Embodiment 3
[0330] Send ACK / NACK on the PUSCH of the GF. When the number of ACK / NACK bits exceeds the predefined threshold, rate matching needs to be performed on the PUSCH. In order to ensure that the base station side and the user side have the same understanding of the rate matching resources, it is necessary to make the user terminal and the base station side have a completely consistent understanding of the number of ACK / NACK bits.
[0331] Different from the scheduling-based PUSCH, the dynamic uplink scheduling signaling (UL grant) of the scheduling-based PUSCH can clearly indicate the number of ACK / NACK bits, while the GF’s PUSCH has no UL grant, so it can only pass the predefined rules and PDSCH The scheduling signaling determines the number of ACK / NACK bits.
[0332]An implementation manner is to limit the number of ACK / NACK bits sent on the PUSCH of the GF to always be an integer multiple of M. Correspondingly, if the base station finds that ACK / NACK may be sent on the PUSCH of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com