Construction method of tall formwork symmetrical suspension climbing triangular truss support system

A triangular truss and tall formwork technology, which is applied in the connection of formwork/formwork/work frame, the processing of building materials, the preparation of building components on site, etc., can solve the problem of large amount of steel pipes and fasteners, complex construction operations, Small operating space and other issues, to achieve the effect of high energy saving and environmental protection, stable frame and fast climbing speed

Inactive Publication Date: 2019-05-24
杭州昂创科技有限公司
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the problems of small operating space under the beam, large amount of steel pipes and fasteners, complex construction operation and long period in the construction technology of the traditional scaffolding support system, and propose a symmetrical suspension climbing triangular truss support system for tall formwork The construction method of this support system replaces the under-beam scaffolding in the traditional formwork support system with a symmetrically suspended triangular truss. After the vertical slideway is installed in place and the triangular truss is assembled and installed, the triangular Raise to the design level, further install the beam formwork and complete the pouring of the beam concrete

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of tall formwork symmetrical suspension climbing triangular truss support system
  • Construction method of tall formwork symmetrical suspension climbing triangular truss support system
  • Construction method of tall formwork symmetrical suspension climbing triangular truss support system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The present invention will be further described in detail below with reference to the accompanying drawings and examples. The following examples are explanations of the present invention and are not limited to the following examples. In the construction of a house construction project, the height of the first floor is 10.5m, and the beam height is 1m. The construction method of the support system of the symmetrical suspension triangular support frame of the tall formwork is adopted.

[0043] Such as figure 1 As shown, one end of the suspension tripod 1 cross bar 103 is equipped with a tie rod fixing fastener 4, and the pull rod 5 is installed in the pull rod fixing fastener 4; the positioning rod 104 welded at one end of the suspension tripod 1 cross bar 103 is installed with a steel pipe 7 and a top. Support 8, a keel 11 is installed on the top support 8, a beam formwork 12 is installed on the keel, and the lateral beam formwork 12 is threaded through a pair of pull sc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of a tall formwork symmetrical suspension climbing triangular truss support system. The main construction steps include vertical slideway installation, triangular truss assembly, triangular truss installation, triangular truss climbing, and beam formwork and support installation. An under beam scaffold in the traditional formwork support system is substituted by a tripod which is symmetrically suspended and combined with pulling and bracing, a plurality of tripods are pulled and combined to form a triangular truss, and a hydraulic climber is further applied to realize an automatic lifting of the triangular truss. The operation space beside and under the beam is large, the construction safety is high, the consumption of steel pipes and fasteners is less, the operation is convenient and the recycling rate of components is high, thereby overcoming the problems such as large supporting and disassembling workload, small operation space, long construction period and unsafe security in the construction of the traditional formwork support system, and the economic and technical benefit is remarkable.

Description

technical field [0001] The invention relates to a construction method for a symmetrical suspension climbing triangular truss support system of a tall formwork, which belongs to the field of construction engineering and is suitable for the construction of a beam-slab support project of a tall formwork. Background technique [0002] In the face of large-span reinforced concrete structure projects, tall and large formwork must be used in the project, and the construction of tall and large formwork is risky, and there are many matters to be paid attention to. The traditional scaffolding support system has the following problems: First, when inspecting, removing formwork, and transporting materials on both sides of the concrete beam, the construction is extremely inconvenient due to the small operating space under the beam and on the side of the beam; Next, scaffolding needs to be set up, which leads to a large amount of steel pipes and fasteners in the project; thirdly, the heav...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04G17/00E04G21/00
Inventor 陈小林朱凯张迎珍
Owner 杭州昂创科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products