Fengshui joint scheduling method considering the accumulation process of weather forecast uncertainty

An uncertainty and weather forecasting technology, applied in climate change adaptation, data processing applications, instruments, etc., can solve the problems of insufficient capacity adjustment capacity of hydropower stations, little hydropower self-benefit, waste of water energy, etc., to improve resources. Optimize configuration capabilities, promote new energy consumption, and achieve the effect of coordinated operation

Active Publication Date: 2021-09-07
ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the significant diurnal fluctuations of wind power output may cause large diurnal differences in equivalent load, thereby increasing the system’s peak-shaving requirements and operating costs; at the same time, the storage capacity of hydropower stations cannot be adjusted in a short time scale. fully use
2) In terms of coordination goals, little attention has been paid to the self-benefits of hydropower
When hydropower compensates for wind power, it usually wastes too much water energy, forming a situation of "abandoned water compensation", making it impossible for hydropower itself to guarantee output
3) In the operation scenario, it is usually based on the hydropower, wind farm station or unit given in advance, and does not consider whether the corresponding hydropower and wind energy resources have a good complementary effect. The optimal power generation plan thus obtained may generate hydropower. "Under compensation" or "abandoned water compensation"
However, most existing studies use constant probability distribution or fuzzy parameters to represent uncertainty, but ignore the relationship between weather forecast uncertainty and forecast period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fengshui joint scheduling method considering the accumulation process of weather forecast uncertainty
  • Fengshui joint scheduling method considering the accumulation process of weather forecast uncertainty
  • Fengshui joint scheduling method considering the accumulation process of weather forecast uncertainty

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0094] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0095]The invention discloses a wind-water joint scheduling method considering the accumulation process of weather forecast uncertainty, which includes the following steps:

[0096] S1. Taking the minimum fluctuation of the joint output of wind and water power generation, the minimum water waste of hydropower in the joint output of wind and water power generation, and the guarantee of the output of the hydropower station in the joint output of wind and water power generation as the goal, establish the long-term joint scheduling objective function of wind and water:

[0097]

[0098] in, E. t-s (P wk.t ) represents the output expectation of the kth wind farm in the (t-1,t) period based on the forecast wind speed of the kth wind farm in the future (t-1,t) period released at time s, P wk.t Indicates the actual output of the kth wind farm in the (t-1,t) pe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention provides a geomantic hydropower joint dispatching method considering the accumulation process of weather forecast uncertainty, including establishing a geomantic hydropower long-term joint dispatching objective function; The hydropower station releases the flow constraint expression, and solves the long-term joint dispatching objective function of Fengshui; based on the fluctuation F of the combined output of Fengshui power generation 1 , Fengshui power generation joint output, hydropower discarded water conversion power F 2 F 3 Carry out Feng Shui joint scheduling. On the basis of considering the accumulative process of medium and long-term wind and runoff forecast uncertainty, the invention takes the minimum fluctuation of wind-water power generation combined output as one of the goals, and is based on the perspective of hydropower stations to meet the guaranteed output of hydropower stations and reduce waste as much as possible. Water is the second and third goals. Under the relevant operational constraints, the coordinated operation of Fengshui resources on a medium and long-term scale is realized.

Description

technical field [0001] The invention relates to the field of wind power control, in particular to a wind-water joint scheduling method considering the accumulation process of weather forecast uncertainty. Background technique [0002] The development and utilization of renewable energy is an important way to deal with global climate change and energy shortages, but at the same time, due to the volatility and uncontrollability of wind energy resources, the problem of wind power consumption has become increasingly prominent. According to statistics, from 2011 to 2015 The annual national average wind abandonment rate reached 13.4%, and in 2016 the national wind abandonment rate reached 17.1%. [0003] Hydropower and wind energy resources have good seasonal complementarity, and the storage capacity adjustment capacity of the reservoir and the rapid response characteristics of the hydropower unit enable the hydropower output to track and compensate the output change of wind power...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06G06F17/18
CPCY04S10/50Y02A30/00
Inventor 朱继忠王伟禤培正熊小伏欧阳金鑫谢平平李梦阳邹金
Owner ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products