Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Novel lifting system for deep-sea mining

A deep-sea mining and lifting system technology, applied in the mining of minerals, special mining, earth-moving drilling, etc., can solve the problems of ecological environment damage, damage to the surface seawater ecosystem, etc.

Active Publication Date: 2019-04-12
JIANGSU UNIV OF SCI & TECH +1
View PDF3 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the deep-sea ore lifting device is composed of a pipeline. After the ore and seawater are mixed in a certain proportion, they are lifted from the seabed to the support ship on the sea surface through the pipeline. After the ore and seawater are separated on the sea surface support ship, the seawater is directly discharged into the sea surface , because the composition of seawater organisms on the seabed, the oxygen content in seawater, pH value, salinity, etc. are different from those of surface seawater, thus destroying the ecosystem of surface seawater and causing certain ecological environment damage

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Novel lifting system for deep-sea mining
  • Novel lifting system for deep-sea mining

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0018] The novel deep-sea mining lifting system of this embodiment, such as figure 1 As shown, including a mining mechanism, a mineral water lifting mechanism and a mineral water separation mechanism, the mining mechanism includes a mining vehicle 17 set on the seabed, the mining vehicle ore suction port 19 is arranged in the front of the mining vehicle 17, and the mining vehicle ore suction port 19 is arranged at the rear of the mining vehicle. Ore conveying pump 18; mineral water lifting mechanism includes high-pressure pump 5, lifting main pipe 6, water pump 7, intermediate bin 11, lift pump 8, driving water turbine 9 and make-up pump 12, and the intermediate bin 11 is fixed on the seabed by the intermediate bin 13 cable 13 It is connected with the fixed pile 14 arranged on the bottom shell of the seabed, and the intermediate bin 11 is connected with the mining vehicle 17 through the hose 16, and the floating body 15 is arranged on the hose 16; , the mineral water separatio...

Embodiment 2

[0022] The novel deep-sea mining lifting system of this embodiment, such as figure 2 As shown, including a mining mechanism, a mineral water lifting mechanism and a mineral water separation mechanism, the mining mechanism includes a mining vehicle 17 set on the seabed, the mining vehicle ore suction port 19 is arranged in the front of the mining vehicle 17, and the mining vehicle ore suction port 19 is arranged at the rear of the mining vehicle. The ore conveying pump 18; the mineral water lifting mechanism includes a high-pressure pumping pump 5, a lifting main pipe 6, a water pumping pipe 7, a high-speed clean water pipe 20 connected to the middle silo 11 and the hoisting main pipe 6. The fixed piles 14 on the bottom shell are connected, and the intermediate silo 11 is connected with the mining vehicle 17 through the hose 16, and the floating body 15 is arranged on the hose 16; With the ore mixing inlet 22 , the mineral water separation mechanism includes an ore storage tan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a novel lifting system for dee-sea mining. The novel lifting system comprises a mining mechanism, a mine water lifting mechanism and a mine water separating mechanism; the mining mechanism comprises a mining cart which is arranged on the sea floor, a mining cart ore absorbing port is arranged on the front part of the mining cart, and a mining cart ore conveying pump is arranged on the rear part of the mining cart ore absorbing port; the mine water lifting mechanism comprises a high-pressure water feeding pump, a lifting main pipe, a water feeding pipe and a middle bin;the middle bin is connected with a fixed pile which is arranged on the sea floor bottom crust through a middle bin sea floor fixing cable rope, the middle bin is connected with the mining cart through a hose, and a floating body is arranged on the hose; the mine water separating mechanism comprises an ore storage tank, a mine water separating mechanism body and a clean water tank which are arranged on a sea surface mining vessel; and the ore storage tank is connected with the clean water tank through the mine water separating mechanism body. The novel lifting system for deep-sea mining has the advantages that hydraulic power is used for lifting, waste water lifted to the water surface can be fed back to the sea floor, meanwhile, a lifting pump on the sea floor can be driven to lift ore through the waste water, and the environment of the mining sea surface is protected.

Description

Technical field [0001] The invention belongs to the field of deep seabed ore mining, and particularly relates to a new type of deep sea mining lifting system. Background technique [0002] With the continuous exploitation of onshore mineral resources, mineral resources are increasingly depleted, resulting in an increasingly intensified contradiction between human demand for mineral resources and the shortage of mineral resources. The exploitation and utilization of seabed mineral resources is an important way to make up for the increasing shortage of onshore mineral resources. strategic initiatives and effective solutions. [0003] The ore lifting system is an important part of the deep sea mining system. The main function of the ore lifting system is to lift the ore on the seabed to the sea surface support ship. At present, deep-sea ore lifting devices are all composed of a pipeline. The ore and seawater are mixed in a certain proportion and lifted from the seabed through ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21C50/00
CPCE21C50/00
Inventor 刘刚汤雁冰卢道华郭浩吴百公许静田宝强苏贞
Owner JIANGSU UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products