Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Environmental real-time monitoring, early warning and tracking management method and system

A real-time monitoring and environmental technology, applied in the direction of testing water, measuring devices, material inspection products, etc., can solve the problems of delay in law enforcement, difficult environmental law enforcement in a timely manner, and difficult feedback from environmental supervision departments, so as to facilitate supervision and management Effect

Inactive Publication Date: 2019-03-08
TAIHUA WISDOM IND GRP CO LTD
View PDF4 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the different data transmission protocols between different monitoring devices, it is difficult to integrate the data of key monitoring objects such as air quality, water quality, and construction site dust.
In addition, due to the lack of methods and means to keep evidence of environmental violations in a timely manner, it is difficult to carry out timely enforcement of environmental violations that have occurred, resulting in environmental damage.
On the other hand, when the environment is damaged, it is difficult for the environmental supervision department to get feedback in the first place, which is likely to cause delays in law enforcement and cause further damage to the environment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Environmental real-time monitoring, early warning and tracking management method and system
  • Environmental real-time monitoring, early warning and tracking management method and system
  • Environmental real-time monitoring, early warning and tracking management method and system

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment

[0057] See figure 1 Shown are specific embodiments of the real-time environmental monitoring, early warning and tracking management method described in this application, and the method includes:

[0058] Step 101, preset air quality monitoring equipment, preset water quality monitoring equipment, and preset construction site dust monitoring equipment. Among them, the indicators currently monitored for construction site dust mainly include PM2.5, PM10, noise, temperature, and humidity.

[0059] Step 102: Display the spatial geographic location of the air quality monitoring equipment, the spatial geographic location of the water quality monitoring equipment, and the spatial geographic location of the construction site dust monitoring equipment on an electronic map corresponding to different symbols.

[0060] Step 103: Collect real-time air quality field data through the air quality monitoring equipment, collect water quality field real-time data through the water quality monitoring equ...

Embodiment 2

[0067] See figure 2 This embodiment provides a real-time environmental monitoring, early warning and tracking management method, which includes:

[0068] Step 201: Preset air quality monitoring equipment, preset water quality monitoring equipment, and preset construction site dust monitoring equipment.

[0069] Step 202: Display the spatial geographic location of the air quality monitoring equipment, the spatial geographic location of the water quality monitoring equipment, and the spatial geographic location of the construction site dust monitoring equipment on an electronic map corresponding to different symbols.

[0070] Step 203: Collect real-time air quality field data through the air quality monitoring equipment, collect water quality field real-time data through the water quality monitoring equipment, and collect construction site dust real-time data through the construction site dust monitoring equipment.

[0071] Step 204: Convert the real-time air quality data, the water qua...

Embodiment 3

[0082] This embodiment provides a real-time environmental monitoring, early warning and tracking management method, which includes:

[0083] Step 301: Preset air quality monitoring equipment, preset water quality monitoring equipment, and preset construction site dust monitoring equipment.

[0084] Step 302: Display the spatial geographic location of the air quality monitoring equipment, the spatial geographic location of the water quality monitoring equipment, and the spatial geographic location of the construction site dust monitoring equipment on an electronic map corresponding to different symbols.

[0085] Step 303: Collect real-time air quality field data through the air quality monitoring equipment, collect water quality field real-time data through the water quality monitoring equipment, and collect construction site dust real-time data through the construction site dust monitoring equipment.

[0086] Step 304: Convert the real-time air quality data, the water quality real-time...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The application discloses an environmental real-time monitoring, early warning and tracking management method and system. The method includes presetting air quality, water quality and site dust monitoring equipment; displaying different symbols corresponding to the air quality, the water quality and a spatial geographic position of the site dust monitoring equipment on an electronic map respectively; collecting real-time data through the monitoring equipment; transmitting the real-time data to a data storage module through a data transmission protocol, and corresponding the real-time data to the spatial geographic position of the monitoring equipment on the electronic map; setting an alarm threshold; and when the real-time data exceeds the set alarm threshold, alarming, by the monitoring equipment, and displaying alarm information at the same time. Multiple environmental data are integrated together, so that supervision and management are facilitated; real-time video monitoring is carried out on the alarm monitoring equipment, videos and screenshots are saved for archiving, and law enforcement information is automatically sent to an environmental law enforcement department, so thatthe environmental law enforcement department can quickly enforce the law, and actions causing environmental damage can be effectively prevented.

Description

Technical field [0001] The invention relates to the technical field of environmental monitoring and management, and in particular to a method and system for real-time environmental monitoring, early warning and tracking management. Background technique [0002] As my country's requirements for environmental governance are getting higher and higher, environmental indicators such as air quality, water quality, and construction site dust have become important targets for monitoring by environmental protection departments at all levels, and they are all included in the scope of daily work. At present, environmental protection departments at all levels can grasp the real-time dynamics of each monitoring object in time with the help of the monitoring data transmitted back by various front-end equipment. However, due to different data transmission protocols between different monitoring equipment, it is difficult to integrate the data of key monitoring objects such as air quality, water ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01N33/00G01N33/18G01N15/06
CPCG01N15/06G01N33/0004G01N33/18
Inventor 郝敬全庄同光赵建云辛国茂马述杰
Owner TAIHUA WISDOM IND GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products