A river flood peak water level prediction method based on conditional probability distribution
A conditional probability distribution, flood peak water level technology, applied in forecasting, weather condition forecasting, complex mathematical operations, etc., to achieve the effect of strong theoretical foundation and reduced arbitrariness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below by means of embodiments and in conjunction with the accompanying drawings.
[0023] Such as Figure 1-Figure 2 As shown, a river channel flood peak water level prediction method based on conditional probability distribution, counts the upstream and downstream flood peak water levels and propagation time series, and on the basis of determining the marginal probability distribution function, uses the Copula function to construct the upstream flood peak water level and downstream flood peak water level, propagation The two-dimensional joint probability distribution function of time, and then solve the conditional probability distribution function of the downstream flood peak water level and propagation time when the upstream flood peak water level is given, and then predict the downstream flood peak water level and its occurrence time. figure 1 It is the calculation flowchart of the present embodiment, and it is carried...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com