A project management system of engineering cost

A project management system and engineering cost technology, applied in the field of engineering cost project management system, can solve the problems of large amount of engineering cost data, many analysis indicators, project delay, etc., to avoid project delay and assignment errors, improve project management efficiency, The effect of improving processing efficiency

Inactive Publication Date: 2019-01-29
深圳市栋森工程项目管理有限公司
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, there is a large amount of project cost data and many analysis indicators, which require a lot of manpower to assign data processing tasks to various project undertaking departments. On the one hand, it is easy to cause project delays due to untimely task assignment; on the other hand, it is easy to cause errors in the manpower assignment process. Causes task assignment errors, which affects the progress of task processing, which is inconvenient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A project management system of engineering cost
  • A project management system of engineering cost

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0053] A project cost project management system, comprising:

[0054] The project input terminal 1 is used to input the content of the business project; when the business department receives the new project content, after sorting out the project content, input the project content through the project input terminal 1, and then output the task start signal;

[0055] The central processing module 2 is connected to the project input terminal 1, and is used to receive a task start signal; after receiving the task start signal, output a task processing review request signal;

[0056] The task processing review module 3 is connected to the central processing module 2, and is used to receive the task processing review request signal from each project undertaking department; after receiving the task processing review request signal, output the review result signal;

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project management system of engineering cost. A technical scheme comprise a project input terminal, a central processing module, a task processing audit module and a storagemodule are also provided with a project tracking module, a first audit module, a supervision module and a standard library, so that the data processing tasks can be automatically assigned to each project undertaking department, the project delay and the assignment errors caused by the manpower assignment can be avoided, and the project management level of the engineering cost can be improved.

Description

technical field [0001] The invention relates to the field of engineering information management, more specifically, it relates to an engineering cost item management system. Background technique [0002] Project cost is an important basis for project financial analysis and economic evaluation. Project management of project cost is an important task of project management and construction. Project management of project cost can effectively control the investment in each stage of project management and construction. [0003] At present, there is a large amount of project cost data and many analysis indicators, which require a lot of manpower to assign data processing tasks to various project undertaking departments. On the one hand, it is easy to cause project delays due to untimely task assignment; on the other hand, it is easy to cause errors in the manpower assignment process. It leads to mistakes in task assignment, which affects the progress of task processing, which is in...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06
CPCG06Q10/063
Inventor 张文明刘冰薛卫亭石陈
Owner 深圳市栋森工程项目管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products