Problems solved by technology

[0003] Due to the different functions of power transmission and transformation projects in the power grid, their evaluation indicators and evaluation standards should be focused and different. Electricity demand projects have high requirements on load rate, and use unified indicators and standards to evaluate all projects, ignoring the functional attributes of projects, and cannot provide targeted suggestions for subsequent construction of such projects. This evaluation method It cannot fully reflect whether the fundamental goal of project construction is realized; the other is to divide power grid engineering projects into public network projects, special power transmission and transformation projects, and networking projects, and divide their roles in the power grid from the spatial and physical aspects of the project. Different evaluation indicators are set for each project to evaluate project operation benefits. This kind of evaluation method has a coarse granularity and does not fully consider the main role of the project in the power grid, which leads to the evaluation results deviating from the main problems to be solved by the project construction. Provide reference for the operation and construction of this kind of project in the future
In addition, the indicators involved in the above two methods do not set evaluation standards, and the evaluation process is highly subjective.
[0004] To sum up, so far, there has been no research on building an evaluation system, proposing evaluation indicators, and clarifying evaluation criteria for meeting electricity demand from the perspective of different system functions of engineering projects.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for evaluating running benefit of power grid project of optimized grid structure
  • Method and system for evaluating running benefit of power grid project of optimized grid structure
  • Method and system for evaluating running benefit of power grid project of optimized grid structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0082] Such as figure 1 As shown, the power grid project operation benefit evaluation method for optimizing the grid structure proposed by the present invention includes the following contents:

[0083] 1. Collect the actual operating power data that needs to be evaluated.

[0084] 2. Evaluate the performance of the power grid project with the optimized grid structure according to the collected power data. The project efficiency evaluation indicators include the contribution performance of the grid structure improvement, the bayonet current check ratio and the average power supply radius difference. Each evaluation indicator The specific evaluation process for project effectiveness is as follows:

[0085] 1) Improve the contribution performance of grid structure

[0086] Calculate the changes in the wiring structure of the surrounding power grid before and after the project is put into operation, and evaluate the contribution effect of the project to improving the grid struc...

Embodiment 2

[0261] The present invention also provides a power grid project operation benefit evaluation system for optimizing the grid structure, the system comprising:

[0262] A data collection module for collecting actual operating power data that needs to be evaluated;

[0263] The project efficiency evaluation module used to evaluate the performance of the power grid project with the optimized grid structure based on the collected power data. The project efficiency evaluation indicators include the contribution performance of the improved grid structure, the bayonet current check ratio and the average power supply radius difference ;

[0264] The project effect evaluation module is used to evaluate the effect of the power grid project with the optimized grid structure according to the collected power data. The project effect evaluation indicators include the maximum load rate of the engineering transformer, the average load rate of the engineering transformer, the maximum load rate ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method and a system for evaluating a running benefit of a power grid project of an optimized grid structure. The method comprises the following contents of collecting actualrunning power data needing to be evaluated; evaluating a power grid project item efficiency of the optimized grid structure according to the collected power data; evaluating a power grid project itemeffect of the optimized grid structure according to the collected power data; evaluating project item safety of the optimized grid structure according to the collected power data; and comprehensivelyevaluating the running effect of a project of the optimized grid structure by comprehensive consideration of the item efficiency, the item effect and the item safety.

Description

technical field [0001] The invention relates to a power grid project operation benefit evaluation method and system for optimizing a grid structure, and relates to the technical field of power grid transmission. Background technique [0002] At present, there are usually two types of methods for evaluating the operational benefits of power grid engineering projects. One is to use the same set of index systems to evaluate the operational benefits of power grid engineering projects of all functional types. [0003] Due to the different functions of power transmission and transformation projects in the power grid, their evaluation indicators and evaluation standards should be focused and different. Electricity demand projects have high requirements on the load rate, and use unified indicators and standards to evaluate all projects, ignoring the functional attributes of the projects, and cannot provide targeted suggestions for the follow-up construction of such projects. This ev...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06395G06Q50/06Y02E40/70Y04S10/50
Inventor 张恒郑燕雷体钧温卫宁汪亚平易文飞邵黎李培栋翟树军徐玉杰李如萍吕岳李士亮
Owner STATE GRID ECONOMIC TECH RES INST CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products