Construction progress plan optimal making method

A technology for construction progress and planning, applied in the direction of calculation, instrumentation, data processing applications, etc., can solve the problems of inability to perform visual simulation, inconvenient adjustment, etc., and achieve the effect of convenient, quick and intuitive modification and adjustment

Inactive Publication Date: 2018-09-28
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF3 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to overcome the defects of the prior art, provide a construction schedule optimization preparation method, and solve the defects of the construction process, the inability to perform visual simulation and the inconvenience of adjustment in the existing preparation method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction progress plan optimal making method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0040] As a preferred embodiment of the present invention, establishing a corresponding BIM model based on construction drawings includes:

[0041] Establish the corresponding professional BIM model according to the professional classification in the construction plan. In each construction project, there are multiple professional classifications. For example, for a building construction project, including organic electricity major and building structure major, when establishing the corresponding BIM model, establish the mechanical and electrical professional BIM model and the building structure major BIM model.

[0042] For different majors, different software can be flexibly selected to establish BIM models, making modeling convenient and quick. When selecting software, consider the data integration requirements and accuracy requirements of each BIM model.

[0043] When establishing a BIM model, according to the requirements of the construction plan, select the BIM model correspon...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction progress plan optimal making method. The method comprises the steps that a corresponding BIM (building information model) is established according to a construction drawing, and lightweight processing is performed; the BIM is imported into BIM progress management software for integration; time parameters are given to all components in the BIM according to aconstruction progress plan in the BIM progress management software, so that the BIM is associated with the construction progress plan; the BIM progress management software is utilized to perform three-dimensional visual simulation on the BIM associated with the construction progress plan, the rationality of the construction progress plan is checked through the visual simulation, and unreasonable parts are optimized to form an optimized construction progress plan and a BIM associated with the optimized construction progress plan; and the construction progress plan in a required format is exported. Through the method, three-dimensional visual simulation on the construction progress plan can be realized, and modification and adjustment of the construction progress plan are convenient and fast.

Description

Technical field [0001] The invention relates to the field of civil engineering construction, in particular to a method for optimizing construction schedule planning. Background technique [0002] With the development of civil engineering construction, the construction management mode, method and technology of the construction industry are also constantly developing and progressing. [0003] In the process of construction project management, management methods and methods such as schedule, quality, cost and safety are constantly innovating. In the process of construction schedule management, compiling the construction schedule plan of the project is a key task of construction schedule management. [0004] The traditional schedule plan preparation method generally uses software such as project to prepare the construction schedule plan based on construction drawings and construction experience. This method has a large number of defects, such as: the compiled construction schedule cann...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/08
CPCG06Q10/04G06Q10/06313G06Q50/08
Inventor 王代兵张学伟姜化强于航
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products