Construction-cost rate-of-progress management device

A technology for progress management and project cost, which is applied in the direction of reusable writing boards, printing, household appliances, etc., can solve the problems of not being able to know the progress well, cannot guarantee the timeliness of supervision, and lack of progress communication, so as to achieve saving Office space, high practicability, simple and reasonable design

Inactive Publication Date: 2018-09-11
SHUNDE POLYTECHNIC
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The current cost process is for the staff to calculate the cost of the project undertaken at different stages according to the information provided by the owner and the information obtained by their own on-site investigation, according to the progress of the project. However, due to the cumbersome work of the cost, it is necessary Supervising the work of personnel, this method can neither guarantee the timeliness of supervision, but also is inefficient. The construction party and the cost party still lack communication in terms of progress, and they cannot know each other's progress well. Therefore, those skilled in the art A project cost schedule management device is provided to solve the problems raised in the above-mentioned background technology

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction-cost rate-of-progress management device
  • Construction-cost rate-of-progress management device
  • Construction-cost rate-of-progress management device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0024] see Figure 1~6 , in an embodiment of the present invention, a project cost progress management device, including a housing 1, a writing board 2 and a progress display board 3, a number of support plates 4 are arranged at equal intervals inside the housing 1, and on the support board 4 The surface is provided with a labeling plate 10, and the surface of the support plate 4 is equidistantly vertically provided with a number of partitions 5, and the progr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction-cost rate-of-progress management device. The device comprises a housing, a writing board and rate-of-progress displaying boards, a plurality of supporting platesare equidistantly arranged in the housing, a marking board is arranged on the tops of the supporting plates, a plurality of separation plates are vertically and equidistantly arranged on the surfacesof the supporting boards, the rate-of-progress displaying boards are connected with the parts between each two separation plates, connecting blocks are arranged in the middles of the side faces on both left and right sides of the housing, supporting arms are rotatably connected with the connecting blocks, and a bottom plate is connected with the lower ends of the supporting arms. Constructing items are written on the marking board, when a stage of construction project is completed, the rate-of-progress displaying boards are supported by the supporting plates arranged below by pulling the supporting boards with hands, the cost of the stage of the construction project is calculated by a cost calculation worker when the cost calculation worker sees the states of the rate-of-progress displaying boards, and after the calculation is completed, the rate-of-progress displaying boards are supported by the bottom of the housing by pulling the supporting plates with hands. By means of the device, the cost calculation worker can get to know the latest rate of progress of the construction in real time, information is fed back to construction workers, and the device is suitable for extensive using of the society.

Description

technical field [0001] The invention relates to the field of project cost progress management, in particular to a project cost progress management device. Background technique [0002] The project cost refers to the construction price of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project. Defined from the perspective of the owner (investor), the project cost refers to the construction cost of the project, that is, all the fixed asset investment expenses that are expected to be paid or actually paid for the construction of a project. These expenses mainly include equipment and tool purchase fees, construction engineering and installation engineering fees, other engineering construction expenses, reserve fees, interest during the construction period, fixed asset investment direction adjustment tax (this fee is currently suspended). [0003] In engineering projects, the enterprise in charge of bidding wil...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): A47B97/04B43L1/00
CPCA47B97/04B43L1/00
Inventor 张入方
Owner SHUNDE POLYTECHNIC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products