A method for gob-side entry retention of advanced deep-hole pre-splitting roof
A technology of retaining gobs and roofs, which is applied in earthwork drilling, ground mining, underground mining, etc., and can solve the problems of increasing roof pressure, inability to cut off goaf side roofs, and increasing deformation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] The position of the roof pre-crack line is determined according to the width of the gob-side entry and the width of the retaining wall beside the entry.
[0048] 30-50m in front of the coal mining face 1, along the roof pre-splitting line 7, construct the roof pre-splitting drilling 5. The pre-splitting drilling 5 has a diameter of ¢40mm-¢80mm, a distance of 1-3m, an inclination of 70°-80°, and a hole depth. 15-25m.
[0049] Before the stress concentration area in front of the working face, put the explosive 29 and the detonator 36 into the blasting tube 37, install the blasting tube 37 section by section from the bottom of the pre-split hole 5 on the top plate until it reaches the lower limit of the pre-split hole, and charge the blasting tube. Length 5-12m.
[0050] The remaining part of the pre-splitting hole 5 is packed with clay 30 .
[0051] Immediately after the charge is completed, blasting is performed, and the kerf 32 is formed along the direction of the roof ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com