A construction method integrating prefabrication and installation of baffles for urban viaducts
A construction method and viaduct technology, applied in the direction of erecting/assembling bridges, bridges, bridge construction, etc., can solve problems such as slow progress and high difficulty, and achieve the effects of reducing interference, labor intensity, and construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art fall within the protection scope of the present invention.
[0033] Such as Figure 1-4 As shown, a construction method integrating prefabrication and installation of urban viaduct baffles according to an embodiment of the present invention includes the following steps:
[0034] S1 uses the top surface of the viaduct 1 which has been prefabricated and installed or cast-in-place as the prefabrication yard of the baffle;
[0035] S2 Along the line direction, on the top surface of the viaduct, it is set as the maintenance and i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com