Bridge construction management system and method based on two-dimensional codes and BIM technology

A bridge construction and management system technology, applied in data processing applications, electromagnetic radiation induction, instruments, etc., can solve the problems that the actual benefits of BIM technology do not meet industry expectations, and the BIM technology is not understood, so as to promote the practical application of engineering and reduce bridges. Construction risk, effect of improving quality and efficiency

Inactive Publication Date: 2017-09-22
中铁南方投资集团有限公司 +1
View PDF4 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, due to various reasons (BIM standard issues, limitations of the software itself, the current engineering system, etc.), BIM technology is far from being widely used in the field of engineering construction, especially in infrastructure fields such as bridges. The actual benefits produced by the technology are far from meeting industry expectations, especially on-site front-line technicians and construction workers, who generally do not understand BIM technology, how to effectively transmit important BIM information to them to help them improve construction quality and reduce operating costs. Risks, and how to apply BIM technology with great value to the actual construction and management of bridge projects under the existing conditions, so as to effectively improve the level and benefits of BIM application in the bridge engineering industry, are placed on the bridge engineering practitioners, Especially an important problem facing technicians

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge construction management system and method based on two-dimensional codes and BIM technology
  • Bridge construction management system and method based on two-dimensional codes and BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0026] Such as figure 1 , The bridge construction management system in this embodiment includes a two-dimensional code generator, a server, an expected construction information generation unit, a construction information real-time collection unit, a construction site interaction terminal, a construction monitoring management terminal, and a public access terminal. The two-dimensional code generator is respectively connected with the server, the expected construction information generation unit, and the construction information real-time acquisition unit, and generates a corresponding two-dimensional code according to the information input by the expected construction information generation unit and the construction information real-time acquisition unit, wherein the two-dimensional code can be It adopts the form of physical label or electronic label, and outputs the generated two-dimensional code to the server for storage. The server receives and stores the expected constructi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a bridge construction management system and method based on two-dimensional codes and a BIM technology. The system includes a two-dimensional code generator, a server, a generation unit of expected construction information, a real-time acquisition unit of construction information, a construction site interaction terminal, a construction monitoring management terminal and a public accessing terminal. The two-dimensional code generator generates the two-dimensional codes of different authorities according to the information input by the generation unit of the expected construction information and the real-time acquisition unit of the construction information, and outputs the two-dimensional codes to the server for storage. The server receives and stores the expected and real-time bridge construction information, and associates the expected and real-time construction information with the two-dimensional codes of the different authorities. The three types of terminals access, through scanning the two-dimensional codes corresponding to authorities thereof, the server to view the bridge construction information. According to the system and method, the BIM technology is utilized to build a bridge construction model, a hierarchical management technology of the two-dimensional codes is used at the same time, differentiated services are presented after personnel of the different authorities scan the codes, the bridge construction management efficiency is improved, and bridge construction quality improvement is promoted.

Description

Technical field: [0001] The invention relates to the field of bridge construction management, in particular to a bridge construction management system and method combining two-dimensional code and BIM technology. Background technique: [0002] At present, BIM (Building Information Modeling) technology has received more and more attention and development in the field of engineering construction in my country. It integrates various relevant information of engineering projects in a digital way, and the completeness, consistency and Relevance is expected to fundamentally solve the problem of information gaps between application systems in various stages of project planning, design, construction, and maintenance management, and realize the full life cycle management of engineering projects, thereby greatly improving the efficiency of engineering construction and maintenance. efficiency and quality. [0003] However, due to various reasons (BIM standard issues, limitations of the s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08G06K7/14
Inventor 刘继强贾晓辉陈登伟蒋四礼邱波吴翔鲲
Owner 中铁南方投资集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products