Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Full-process three-dimensional dynamic safety management method of building enterprise

A technology of safety management and dynamic safety, applied in data processing applications, instruments, resources, etc., can solve the problems of repeated safety management work, casualties, and failure to discover at the first time, so as to ensure the safety of life and property, and improve safety management. horizontal effect

Inactive Publication Date: 2017-09-08
HEFEI UNIV OF TECH
View PDF3 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the past, the safety management methods of construction enterprises were divided into two steps: pre-prevention and post-event processing. Through the safety production responsibility system, an inspection mechanism was established, and safety production accidents were reported layer by layer, and then post-event processing was arranged. There was a lack of safety management throughout the process. Monitoring, safety The person in charge of management lacks subjective initiative, passively receives the safety management data submitted by the safety officer of the engineering project department, cannot obtain the real status information of the safety status of the engineering project at the first time, and cannot intuitively display and quickly locate the safety hazards, and conduct targeted At the same time, security incidents are often not discovered in the first place, and unnecessary casualties and material losses are often caused by delays in disposal and rescue.
After the project is completed, accepted and put into use, the safety management ends immediately. The safety hazards of the same type, the same body, and the same characteristics often have similarities. A large number of safety hazard data and safety event information cannot be accumulated and learned from experience. , resulting in a waste of knowledge, and also a waste of resources such as duplication of manpower and material resources in the safety management work of construction enterprises

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full-process three-dimensional dynamic safety management method of building enterprise

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] Such as figure 1 As shown, a three-dimensional dynamic safety management method for the whole process of a construction enterprise includes the following steps:

[0031] The first step: classify and identify the hidden dangers of the engineering project, mainly including storing the basic information of the engineering project in the updated safety risk assessment database, classifying and identifying the hidden dangers of the engineering project, generating the engineering project safety assessment report and work responsibilities, Announce to the head of the construction company and the safety management responsible person of the secondary company, and send a mobile phone SMS reminder.

[0032] Among them, the types of safety management elements of engineering projects refer to the safety management elements of various types of engineering projects including but not limited to water conservancy engineering, road engineering, bridge engineering, and housing construction eng...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a full-process three-dimensional dynamic safety management method of a building enterprise. According to the method, a bidirectional closed-loop operation mode is utilized. Through performing classification and identification processing on engineering projects which enter a safety risk evaluation database, an engineering project safety evaluation report is generated. An engineering project three-dimensional dynamic safety hazard monitoring model is established in a second-level enterprise layer and potential hazard early-warning information is issued. Real-time monitoring for sensor and video, and artificial regular checking and modification are performed at a project part. A safety accident is handled immediately. The three-dimensional dynamic safety hazard monitoring model is instantly updated. After the engineering project is finished, updating learning is performed on a safety risk evaluation database. According to the full-process three-dimensional dynamic safety management method, learning and reutilization are performed on safety management historical data of the building enterprise. Advanced forecasting, early warning and prevention are performed on the potential safety hazard. The safety event is reasonably handled immediately after occurrence. Safety of persons, fund and property in the engineering project of the building enterprise can be effectively ensured. Furthermore loss is reduced.

Description

Technical field [0001] The invention relates to the technical field of safety management of construction enterprises, in particular to a three-dimensional dynamic safety management method for the whole process of construction enterprises. Background technique [0002] As the scale of construction enterprises continues to grow, in order to implement national safety production guidelines and policies, clarify safety production responsibilities, strengthen safety production management, and protect people’s lives and property safety, construction enterprises need to conduct safety production for secondary companies and engineering project departments. Timely and efficient management and control, and the three-dimensional dynamic safety management of the whole process have become an inevitable trend for construction companies to implement the safety production policy of "safety first, prevention first, comprehensive management". In the past, the safety management methods of constructi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06G06Q50/08
Inventor 姜慧吴红星韩江洪巢良存张建军
Owner HEFEI UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products