Method for calculating displacement of existing shield tunnel caused by ground loading
A technology for shield tunneling and displacement calculation, which is applied in tunneling, calculation, and tunnel lining, etc., and can solve problems such as the inability to calculate the amount of segment misalignment, and the failure to consider the joint effect between the tunnel ring
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] The technical scheme of the present invention will be further described below in conjunction with the accompanying drawings of the description:
[0068] Such as Figure 1~5 As shown, the present invention proposes a specific embodiment of the existing shield tunnel displacement calculation method caused by ground surcharge, specific working conditions and parameter values: a shield tunnel with length L=50m and width B= For a 30m residential building, the long side direction is parallel to the longitudinal axis of the subway tunnel, the average vertical load value at the bottom of the building foundation is q=80kPa, the horizontal distance between the load center and the tunnel center is s=30m; the buried depth of the shield tunnel axis is H=12m , segment outer diameter D=8.4m, thickness 0.45m, ring width δ=1.2m, segment elastic modulus E=42GPa, k t =4×10 5 kN·m -1 ; Poisson's ratio of soil μ = 0.35, elastic modulus E s =25MPa, soil weight γ=18.5kN / m 3 ; N takes 250...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com