Method for entering project progress data in construction project management system

A technology of construction engineering and management system, which is applied in the field of engineering progress data entry of construction engineering management system, which can solve the problems of cumbersome work discipline inspection committee and waste of human resources.

Active Publication Date: 2021-01-26
浙江网筑信息技术服务有限公司
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to solve the problems in the above-mentioned prior art. If multiple projects are provided with financial support at the same time, multiple forms need to be tracked and processed, and the work of analyzing and processing the forms is cumbersome, but what is often needed is the Some data, therefore, if dedicated personnel are assigned to analyze and process the form, it will cause a great waste of human resources. It provides a highly automated and accurate project progress data available in the construction project management system. Entry method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for entering project progress data in construction project management system
  • Method for entering project progress data in construction project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0064] A construction project management system project progress data entry method, comprising the following steps:

[0065] Step 1: The builder uploads unconstructed photos and renderings of the building;

[0066] Step 2: The builder takes photos of the current building according to the progress and uploads them to the construction project management system, and the construction project management system saves the photos as the current progress;

[0067] Step 3: The user continues to take photos of the current concealed project according to the progress of the construction project and then uploads the photos to the construction project management system. The construction project management system adjusts the current photo and compares it with the current progress to select the difference in the construction project. Then save the current photo as the current progress;

[0068] Step 4: If the current difference part is a concealed project, then execute step 5, otherwise, the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for entering project progress data in a construction project management system, which solves the shortcomings of the prior art. The technical solution is as follows: Step 1: The builder uploads unconstructed photos and renderings of the building; Take photos of the current building and upload them to the construction project management system, and the construction project management system will save the photos as the current progress; Step 3: The user continues to take photos of the current hidden project according to the progress of the construction project and then continue to upload the photos to the construction project Management system, the construction project management system adjusts the current photo and compares it with the current progress, selects the difference in the construction project, and then saves the current photo as the current progress; Step 4: If the current difference is a concealed project, execute Step 5, otherwise the construction The project management system judges the difference between the current construction project and compares it with the renderings. If the contrast of the current difference is greater than the threshold, it is in line with the current progress.

Description

technical field [0001] The invention relates to an operation method of a construction engineering material management system, in particular to a method for inputting project progress data in the construction engineering management system. Background technique [0002] At present, in China, the construction industry is a pillar industry. The process management of the construction industry is a difficult point in my country's construction management. In the construction industry, the required construction project funds are high, the construction cycle is long and the capital recovery is slow, and construction material suppliers are involved. The degree is high, and in the whole project practice, advance payment is a common phenomenon. The capital advances to the construction unit often has requirements for multiple projects such as the qualification of the construction unit, construction process, construction capacity, and financial status, and needs to deal with an extremely l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/08
CPCG06Q10/06G06Q10/10G06Q50/08
Inventor 宓建栋
Owner 浙江网筑信息技术服务有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products