Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

User load response incentive integral calculating method and system

A load response and electricity load technology, applied in the user load response incentive integral calculation method and system field, can solve problems affecting thousands of households, disruption of enterprise production plans, and less consideration of customers' own wishes, etc.

Inactive Publication Date: 2017-06-13
SHENZHEN POWER SUPPLY BUREAU
View PDF3 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Due to the limitation of technical conditions, the traditional peak staggered power consumption is unilaterally formulated by the power company, and the customer's own wishes are rarely considered. Therefore, when the peak staggered plan is implemented, it is always enforced, and most of the loads that are staggered It is normal production electricity consumption, which makes the production plan of the enterprise likely to be disrupted
Once the enterprise arranges to work overtime during the low power consumption period at night, it will affect thousands of households. At the same time, there are still many non-important and interruptible loads in the power grid, which have not stopped running during the off-peak period.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • User load response incentive integral calculating method and system
  • User load response incentive integral calculating method and system
  • User load response incentive integral calculating method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0032] Such as figure 1 As shown, in the embodiment of the present invention, a method for calculating user load response incentive points is provided, and the method includes:

[0033] Step S1. Predict the grid power load curve and the maximum value of the grid power supply for the next day, and screen out the grid power load values ​​that meet the predetermined conditions in the next day according to the predicted grid power load curve and the maximum value of the grid power supply. The time period is also used as the time period of peak shifting power consumption, and the start time and termination time of entering each peak power consumption time period in the next day are further determined;

[0034] The specific process is, based on the AMI cloud platform s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a user load response incentive integral calculating method. The method includes the steps that a power grid electrical load curve and a power grid power supply maximum value of a next day are predicted, time periods with power grid electrical load values of the next day meeting preset conditions are screened out to serve as peak shifting electrical time periods according to the power grid electrical load curve and the power grid power supply maximum value, and starting time and ending time are determined; peak shifting electrical response time of the peak shifting electrical time periods are determined; a user electrical load curve of the next day is predicted, electrical load values of the peak shifting electrical response time on the peak shifting electrical time periods are obtained, and electricity consumption of user participated peak shifting electrical down-regulation on the peak shifting electrical time periods is further calculated; a user load response incentive integral is calculated according to the electricity consumption of user participated peak shifting electrical down-regulation on the peak shifting electrical time periods. By means of the method, the user load incentive integral is calculated, a promotional quantification method is formulated, and then electricity customers can voluntarily participate in the peak shifting electrical process.

Description

technical field [0001] The invention relates to the technical field of grid load detection, in particular to a user load response incentive integral calculation method and system. Background technique [0002] Peak staggered power consumption is based on the load characteristics of the power grid, through administrative, technical, economic and other means to transfer part of the load during the peak period of power grid consumption to the low-peak period of power consumption, thereby reducing the peak-valley load difference of the power grid. According to the principle of "for fixed use", the utilization rate of power generation and power supply equipment is maximized, the load rate of the power grid is increased, and the security and economy of the power grid are improved. [0003] At present, there are two main means of implementing peak-shifting power consumption on the power grid, one is economic means, and the other is administrative means. In economic means, use the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00
CPCH02J3/00H02J3/003H02J2203/20
Inventor 温克欢薛冰黄怀东孙文静李伟华刘明祥
Owner SHENZHEN POWER SUPPLY BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products