Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of tunnels and tunnel lining trolley adopting same

A technology for lining a trolley and a construction method, which is applied to tunnel lining, tunnel, shaft lining, etc., can solve the problems of investment in construction and maintenance costs, the inability of trolleys to pass, and the increase in equipment costs, so as to ensure its own strength and anti-deformation ability. , The effect of reducing labor costs and equipment costs, and reducing the number of trolleys

Active Publication Date: 2017-06-13
HUNAN WUXIN TUNNEL INTELLIGENT EQUIP CO LTD
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the tunnel length is not long, one trolley can line multiple tunnels, but because the traditional secondary lining trolley in the main tunnel cannot pass through the construction branch tunnel, it is often necessary to configure one or more trolleys for each tunnel Construction is carried out separately, or the trolley is dismantled and then transported to another tunnel by means of transportation and reassembled for construction
[0004] Therefore, in the working condition of parallel construction of multiple tunnels, the application of the lining trolley in the prior art has the following defects: (1) the distance between the portal frame and the formwork in the trolley is relatively short, and the demoulding shrinkage of the trolley It is very limited, and can only be demoulded and shrunk to less than 20 cm from the tunnel lining surface, which cannot meet the requirements of passing through the construction branch hole; (2) The trolley cannot pass through the construction branch hole, and each tunnel needs to be equipped with one or more units vehicles, the cost of equipment is greatly increased, and the assembly of multiple trolleys and the dismantling after construction are required to consume a lot of manpower and material resources, and more investment in construction and maintenance costs is required; (3) the existing trolleys are only used for Construction of straight tunnels, not suitable for tunnel construction with a certain amplitude

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of tunnels and tunnel lining trolley adopting same
  • Construction method of tunnels and tunnel lining trolley adopting same
  • Construction method of tunnels and tunnel lining trolley adopting same

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059] A tunnel construction method, specifically for the construction of multiple main tunnels arranged side by side. Adjacent main tunnels are connected through branch tunnels Z. Here, four main tunnels (D1, D2, D3 and D4) are shown in the figure. See details figure 1 . The tunnel lining trolley used in its construction is as follows: Figure 2-Figure 6 As shown, it specifically includes a gantry system 1, a formwork system 2, a connecting part 3 connecting the gantry system 1 and the formwork system 2, a traveling mechanism 4 that drives the entire trolley to travel, and a control system that controls the movement of the entire trolley.

[0060] The gantry system 1 includes a frame part 1.1 and a jacking mechanism 1.2 and a bracket part 1.3 which are simultaneously arranged on the frame part 1.1, and the detailed structure is as follows:

[0061] The framework section 1.1 (see figure 2 and image 3 ) is a mouth-shaped structure consisting of two gantry beams 1.11 and t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method of tunnels. The construction method specifically comprises the following steps that (1), a lining trolley is assembled; (2), the lining trolley travels into a master cave to conduct lining construction; (3), after master cave construction is completed, first conversion of the lining trolley is conducted, and the lining trolley travels into a next master cave through a branch cave; (4), second conversion of the lining trolley is conducted, and the lining trolley after second conversion conducts lining construction; and (5), the step (3) and the step (4) are repeated to construct the multiple master caves, third conversion of the lining trolley is conducted, and lining construction of the tunnels is completed. By adoption of the construction method, the technical step is concise, the construction requirements of the multiple tunnels which are arranged side by side are met by one trolley, and labor cost and device cost are reduced. The invention further discloses the tunnel lining trolley. The tunnel lining trolley has the effects that the overall structure is concise, and assembling is convenient; and the trolley has a large lifting quantity, and the double requirements of master cave lining and smooth passing of short branch caves are met.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a tunnel construction method and a tunnel lining trolley used therefor. Background technique [0002] Tunnels are more and more widely used in the prior art. In tunnel construction, multiple tunnels are often constructed in parallel, and construction branch tunnels are set between parallel tunnels. The construction branch tunnels intersect with the main tunnel at a non-perpendicular angle to facilitate the transfer of materials in the tunnel, and the cross-section of the construction branch tunnels Generally, it is much shorter than the cross section of the main hole. [0003] The variety of tunnel sections determines the specific characteristics of the trolleys. When the tunnel length is not long, one trolley can line multiple tunnels, but because the traditional secondary lining trolley in the main tunnel cannot pass through the construction branch tunnel, it is o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10
Inventor 王祥军龚俊王慧民曾勇
Owner HUNAN WUXIN TUNNEL INTELLIGENT EQUIP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products