Flexible-pier horizontal separation seam construction method and construction device
A construction method and pier technology, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of high cost, shallow depth, easy damage of decorative blocks, etc., and achieve the effect of simple structure, simple construction process, and convenient production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0050] refer to figure 2 and image 3 , the construction method of the horizontal separation fracture of the flexible bridge pier is to use the construction device for the horizontal separation fracture of the flexible bridge pier in the above-mentioned embodiment as a tool for construction, wherein the first bottom pumping board 20, the first rigid foam board 30, the first sealing The side drawing board 40, the first top layer drawing board 50, and the first film material 60 are respectively connected with the second bottom drawing board 200, the second rigid foam board 300, the second edge sealing drawing board 400, the second top layer drawing board 500, the second The two thin film materials 600 have the same structure. refer to Figure 4 to Figure 8 , taking the first bottom pumping board 20, the first rigid foam board 30, the first edge sealing pumping board 40, the first top layer pumping board 50 and the first film material 60 as examples to illustrate the molding s...
no. 2 example
[0070] refer to Figure 9 and Figure 10 , and combined with figure 2 , applying the inventive concept of the first embodiment of the construction method for the horizontal separation and fracture of flexible bridge piers, the difference of the second embodiment of the construction method for the horizontal separation and fracture of flexible bridge piers is that the construction of the second embodiment of the construction method for the horizontal separation and fracture of flexible bridge piers The method may also include the steps of:
[0071] Preprocessing steps:
[0072] Clean up the to-be-constructed area 96 of the pier on the cap 92, so that the to-be-constructed area 96 can adhere to the concrete to be poured, and improve the connection between the pier unit section and the to-be-constructed area 96 on the cap 92 Quality, thereby improving the construction quality of bridge piers, and ensuring the safety of bridge piers in later use. In addition, pre-embed the st...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com