Method for controlling train operation on basis of train operation grades
A technology for operating levels and trains, applied to signal indicators on vehicles, transportation and packaging, railway car body parts, etc., can solve problems such as deviation, failure to reach control objectives, and lack of real-time performance to meet control objectives the effect of the requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] figure 1 A schematic diagram of the working principle of a train automatic control system provided by an embodiment of the present invention. During train operation, the ATP system continuously reads line data (slope, curvature, parking position, line speed limit) and detects the distance between the train and the train ahead. The distance between them is used to calculate the braking curve and send it to the ATO system, requiring ATO to control the speed of the train not to exceed the braking curve. In addition, ATO also receives the actual speed of the train and the distance traveled by the train from the ATP, and receives information such as the operation chart data (current time, target time, jump stop operation, detaining the train) and the train operation level from the ATS. ATO sends control and signal instructions to the vehicle according to the received information and the vehicle parameters sent by the vehicle (train load, maneuverability, braking capacity, hi...
Embodiment 2
[0086] Assuming that train A will depart for the next stop, train A will receive the operation data from the travel control center. The operation control center determines the running time of the train between stations A according to the punctuality of the timetable and the traffic volume of the system. The pre-planned inter-station operation levels 2, 3, 4 and their corresponding recommended speed curves are stored in the on-board equipment. Among them, when the operation level two is selected, the train runs completely according to the timetable, which cannot meet the requirements of the control target. Levels 3 and 4 are the operating levels that meet the control objectives, but the operating time is longer. The higher the operation level, the higher the satisfaction of the control objectives and the longer the corresponding operation time. If the train departs earlier than the scheduled time in the timetable, the running time of the train in the interval of arriving at t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com