Green construction evaluation method
An evaluation method and construction scheme technology, applied in the field of ecological environment, can solve the problems of lack of green construction level, lack of green construction evaluation and so on
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] The construction stage is the stage that consumes the most labor, capital, materials, and mechanical power in the entire life cycle of a building. This stage consumes a lot of energy and natural resources and has a great impact on the surrounding environment. Therefore, throughout the construction industry, the construction phase deserves adequate attention. In order to realize the sustainable development of the construction industry, the production mode in the construction stage must be changed.
[0014] Green construction can be regarded as including site selection, design, construction, operation and maintenance, and recycling and demolition of green building projects. It is the realization process of green buildings and a concept of green control in the whole process. Green construction can also be seen as the management and control of the construction stage to achieve the goals of resource conservation and environmental protection.
[0015] Green construction is ...
Embodiment 2
[0023] A green construction evaluation method, the method comprises the following steps:
[0024] The green construction evaluation system is divided into layers, the first layer is the target layer. Starting from the second level of indicators, the indicators of the lower level are all specific to the indicators of the upper level. The lower-level indicators should reflect the corresponding upper-level indicators scientifically, accurately and objectively. The upper and lower indicators should belong to the total score relationship. From the content point of view, the lower the indicator level, the more specific and intuitive the indicator content.
[0025] Determine the energy consumed by construction X 1 , which includes the energy savings X 11 , Fuel savings X 12 , Energy utilization X 13 , the energy saving X 11 The ratio of the actual power consumption for construction to the consumption quota; the fuel saving X 12 The ratio of the actual fuel consumption for cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com