Tunnel karst cave and underground water comprehensive treatment structure and construction method
A comprehensive treatment and groundwater technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems of blind blocking, long construction period, difficult blocking, etc., to ensure construction safety, fast and convenient construction, Actionable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0021] refer to figure 1 , the tunnel karst cave and groundwater comprehensive treatment structure of the present invention includes the karst cave 30 above the surrounding rock 10 revealed during the excavation process. The outside of the surrounding rock 10 is provided with an external drainage shaft 20 connected to the ground, an internal vertical shaft 21 is provided below the surrounding rock 10, and a horizontal drainage channel 22 connecting the external drainage shaft 20 and the internal vertical shaft 21 is provided. The surrounding rock 10 A fully-sealed anti-water pressure lining is constructed on the outside, and the fully-sealed anti-water pressure lining extends for a certain length before and after the karst cave 30.
[0022] The present invention adopts sealing and draining combined technical measures. A drainage shaft is set outside th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com