Power grid construction new project cost rapid estimation method based on fuzzy mathematics
A technology of fuzzy mathematics and cost, applied in the field of electric power, can solve problems such as insufficient accuracy and strong subjectivity, and achieve the effect of accurate work and quick query
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0025] The principle of the rapid estimation method in the present invention is: the principle of the whole process, the principle of data mining technology, the principle of hierarchical analysis, the principle of fuzzy similarity priority ratio, and artificial neural network.
[0026] The fast estimation method content of the present invention comprises:
[0027] (1) For the huge cost data of power grid construction projects, establish a database to realize historical data query
[0028] Collect historical data of power engineering costs of different project types, and collect historical engineering cost data according to project type, voltage level, construction nature and other attributes. The database mainly includes the estimation, budgetary estimates, bidding, Technical and economic data of settlement and final accounts results. Form a historical project cost database with wide data coverage and relatively complete data content, provide a relatively complete collection...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com