Resource allocation method and resource allocation device
A technology of resource allocation and resource allocation, applied in the field of resource allocation, it can solve the problem of unable to realize the scheduling of data packet priority, and achieve the effect of improving system performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0133] Embodiment 1: report through dedicated signaling.
[0134] Step 1: The terminal determines the first corresponding relationship between the PPP and the LCG ID.
[0135] In the embodiment of the present invention, the terminal can determine the first correspondence between PPP and LCG ID by itself. For logical channels corresponding to different destination addresses of a terminal, the first correspondence between PPP and LCG ID can be the same or different.
[0136] If they are the same, the terminal can directly determine the first correspondence between the PPP and the LCG ID. For example, if the number of LCG IDs is the same as the number of PPP levels, the base station may use a 1:1 mapping manner when configuring the correspondence between PPP and LCG IDs. However, if the number of LCG IDs is less than the number of PPP levels, m:1 (m≥1) mapping needs to be considered. An example is as follows: If the number of PPP levels is 8 and the number of LCG IDs is 4, then...
Embodiment 2
[0163] Embodiment 2: report through the sidelink BSR MAC CE.
[0164] Step 1: The terminal itself determines the corresponding relationship between the PPP and the LCG ID.
[0165] In the embodiment of the present invention, the terminal can determine the first correspondence between PPP and LCG ID by itself. For logical channels corresponding to different destination addresses of a terminal, the first correspondence between PPP and LCG ID can be the same or different.
[0166] If they are the same, the terminal can directly determine the first correspondence between the PPP and the LCG ID. For example, if the number of LCG IDs is the same as the number of PPP levels, the base station may use a 1:1 mapping manner when configuring the correspondence between PPP and LCG IDs. However, if the number of LCG IDs is less than the number of PPP levels, m:1 (m≥1) mapping needs to be considered. An example is as follows: if the number of PPP levels is 8 and the number of LCG IDs is 4,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com