A gas measurement and evaluation method for low gas-oil ratio reservoirs
An evaluation method and technology of gas-oil ratio, applied in earthwork drilling and production, wellbore/well components, etc., can solve problems such as difficulty in meeting interpretation requirements, increased exploration costs, and low overall compliance rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0071] The technical solution of the present invention includes the following steps.
[0072] Step 1 Obtain oil well data: collect on-site gas testing data and oil testing data.
[0073] Step 2 parameter quality control: establish a gas measurement quality control curve template, such as figure 1 shown. figure 1 middle,
[0074] C1 is methane, C2 is ethane, C3 is propane, iC4 is isobutane, and nC4 is normal butane.
[0075] Full hydrocarbon: full hydrocarbon=C1+C2+C3+nC4+iC4+nC5+iC5.
[0076] Heavy hydrocarbons: heavy hydrocarbons=C2+C3+nC4+iC4+nC5+iC5.
[0077] Humidity ratio: Wh=(C2+C3+nC4+iC4+nC5+iC5) / (C1+C2+C3+nC4+iC4+nC5+iC5).
[0078] Balance ratio: Bh=(C1+C2) / (C3+nC4+iC4+nC5+iC5).
[0079] Quality control curve value: R Q =(C1+C2+C3+C4+C5) / (C1+2C2+3C3+4C4+5C5).
[0080] Import the gas logging data into the quality control curve template, and the quality control curve template will automatically calculate the quality control ratio range based on the gas logging...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com