Slope ecological greening system of vegetation concrete double-layer protective net and method for using the system for slope ecological greening
A technology of planting concrete and double-layer protective nets, applied in excavation, construction, infrastructure engineering, etc., can solve problems such as the inability to realize large-scale three-dimensional greening and harsh plant growth environments, so as to restore the natural landscape and protect the overall stability , Improve the effect of shear strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Such as figure 1 As shown, a vegetation concrete double-layer protective net slope ecological greening system includes vertical and horizontal support ropes and multiple anchor rods or anchor cables 1 buried on the slope 6, vertical and horizontal support ropes and buried on the slope 6 A plurality of anchor rods or anchor cables 1 constitute a protective net fixing system,
[0044] The basic protective net 2 and the surface protective net 4 are each composed of a plurality of protective net blocks spliced together;
[0045] The protective mesh block is a high-strength steel wire grid protective mesh block, and the surface is treated with hot-dip galvanized anti-corrosion and anti-rust treatment.
[0046]The base protection net 2 and the surface protection net 4 are laid on the top of the slope 6 through vertical and horizontal support ropes and multiple anchor rods or anchor cables 1, and the gap between the base protection net 2 and the side slope 6 and the top of ...
Embodiment 2
[0064] The method for performing slope ecological greening by utilizing the above-mentioned vegetation concrete double-layer protective net slope ecological greening system, the method includes the following steps:
[0065] Step 1: cleaning the slope 6;
[0066] Step 2: After drilling and clearing holes on the cleaned slope 6, set multiple anchor rods or anchor cables 1 and vertical and horizontal support ropes on the slope 6;
[0067] Step 3: After the slope 6 is installed and the holes are cleared, install multiple connecting devices on the slope 6;
[0068] Step 4: Lay the base protection net 2, and fix each protection net block of the base protection net 2 to the vertical and horizontal support ropes and multiple anchor rods or anchor cables 1 to form the protection net fixing system through suture ropes or hooks, and then the base protection Each protective net block of net 2 is inserted into the middle part of each corresponding connecting device piece by piece, to limi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com