Segmental assembling box girder construction technology
A construction technique and a technology of assembling boxes, which are applied in erecting/assembling bridges, bridges, bridge construction, etc., and can solve problems such as high requirements for bridge substructure, complicated erection and construction process, and poor visibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0128] Such as figure 1 A construction process of segmentally assembled box girder is shown, the box girder to be constructed is a perforated beam, and each hole beam of the constructed box girder is composed of a plurality of box girder segments 1 assembled from back to front, and the box girder segment Section 1 is a reinforced concrete beam section;
[0129] When constructing the box girder to be constructed, the process is as follows:
[0130] Step 1. Box girder segment prefabrication: According to the conventional box girder prefabrication process, all box girder segments 1 used for assembling the constructed box girder are prefabricated in the prefabrication yard;
[0131] Step 2. Delivery of box girder segments: transport all box girder segments 1 in step 1 to the erection position of the box girder to be constructed by using a beam transport vehicle;
[0132] Step 3. Box girder erection: use the down-going bridge erecting machine to erect the constructed box girder, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com