Construction method for carrying out pile sinking based on floating walking platform
A technology of floating platform and walking platform, which is applied in the direction of foundation structure engineering, artificial island, sheet pile wall, etc. It can solve the problems of time-consuming and labor-intensive concrete pile foundation, difficult construction, poor environmental protection effect, etc., and achieve convenient transportation and layout structure Simple and reasonable, cost-saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Embodiment 1: as Figure 1-7 , is the floating walking platform of the present embodiment, the floating walking platform of the present embodiment comprises a floating platform 1 and four supporting columns 2 vertically pierced on the four corners of the floating platform 1 respectively, and the floating platform 1 is a buoyant box type structure capable of It floats stably on the water surface and has a square structure. The four support columns 2 vertically pass through the four corners of the floating platform 1, and are symmetrically fixed on the floating platform 1. The upper end surface of the floating platform 1 is equipped with a fixed frame 3, which is a cylindrical structure, and the support columns 2 pass through the fixed frame. frame 3 and floating platform 1.
[0040] Such as Figure 4~5 As shown, the lower end of the fixed frame 3 is equipped with a fixed lock 5, and the upper end is fixedly equipped with a jacking jack 4, and the lower end of the jacki...
Embodiment 2
[0058] Embodiment 2: The structures of the floating walking platform and the guiding device used in this embodiment are the same as that of the device in Embodiment 1, and the method of use is the same.
[0059] During actual construction, during the jacking process, hard soil or rock structures may appear on the seabed, and the gravity of the floating platform 1 alone cannot directly drill through the structure, and the support column 2 cannot extend into the seabed. The load capacity of 1 does not meet the design requirements, if the crawler crane 7 and other devices are transported to the floating platform 1 rashly, a safety accident may occur. In order to increase the insertion depth of the support column 2, the embodiment alternately cooperates with the lifting jack 4, the fixed lock 5 and the movable lock 6 to lift the two support columns 2 on the diagonal of the floating platform 1 (such as image 3 Shown A and C two supporting columns 2) make it stop after inserting a ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com