Construction progress management method based on visualization technology
A technology of construction progress and management methods, applied in information technology support systems, data processing applications, instruments, etc., can solve the problems that the construction progress of hydropower dams cannot be controlled intuitively in real time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] see figure 1 , based on visualization technology, through the establishment of BIM model, after the schedule plan is compiled, the WBS item association model of the schedule plan. The system can simulate the schedule in the 3D scene according to the selected schedule. During the construction process, the actual progress is entered, and the system can compare the actual progress with the overall construction progress plan. If there is a delayed project, the project will be displayed in the 3D scene with a special mark. If the system finds that the start time or completion time of the actual progress of a certain sub-item is later than the estimated latest start time and estimated latest completion time of the overall construction schedule, the system will display the progress warning information in a symbolic model, through visualization technology , to simulate, analyze and compare the on-site construction schedule.
[0014] see figure 1 , the control sequence is m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com