Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Additional elevator arranging and seismic reinforcement integral construction method for multi-storey houses

A construction method and housing technology, applied in building structure, earthquake resistance, construction, etc., can solve the problems of high cost, shortened construction period, environmental pollution, etc., and achieve the effects of improved earthquake resistance, brittle failure characteristics, and improved ductility

Inactive Publication Date: 2016-02-03
SHANGHAI RES INST OF BUILDING SCI CO LTD +2
View PDF7 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The present invention aims at the defect that existing early multi-storey buildings are constructed separately in the process of adding elevators and anti-seismic reinforcement, which is likely to cause environmental pollution, affect people's normal life, and have high cost, and provides an integration of adding elevators and anti-seismic reinforcement in multi-storey residential buildings The construction method, adding elevators and seismic reinforcement work to multi-storey buildings at the same time, shortens the construction period, reduces construction costs, reduces the impact of building construction and renovation on residents, and protects the environment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Additional elevator arranging and seismic reinforcement integral construction method for multi-storey houses
  • Additional elevator arranging and seismic reinforcement integral construction method for multi-storey houses
  • Additional elevator arranging and seismic reinforcement integral construction method for multi-storey houses

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] as attached Figure 2-6 Shown, a kind of multi-storey house adds elevator and anti-seismic reinforcement integrated construction method, is characterized in that, it comprises the following steps:

[0033] (1) Correspondingly add concrete shear wall elevator shafts at the existing outdoor stairwells or patios of multi-storey residential buildings;

[0034] The elevator shaft is a concrete shear wall. The elevator shaft is connected with the existing multi-storey residential wall by using pin keys and chemical planting bars. The thickness of the shear wall of the elevator shaft is ≥ 160mm. The steps include:

[0035] (a) Drill keyholes on the horizontal wall of the existing multi-storey residential outer wall, the size of the keyholes is 120mm×120mm×120mm or 160mm×160mm×160mm, and the vertical spacing of the keyholes is 500mm;

[0036] (b) In the vertical direction of the horizontal wall along the outer wall of the existing multi-storey residential building, the chemica...

Embodiment 2

[0044] The outer side of the existing multi-storey residential enclosure wall can also be connected with the existing multi-storey residential external wall by using a single-sided concrete slab wall, and the single-sided concrete slab wall and the existing multi-storey residential external wall use When chemical planting reinforcement is connected and strengthened, the thickness of the slab wall is 60-100mm, the concrete strength grade should be ≥C20, and the horizontal distribution reinforcement and vertical distribution reinforcement adopt the specification of φ8~φ12. The specific steps include:

[0045] (i) Bind the steel wire mesh before pouring the single-sided concrete slab wall;

[0046] (ii) On the original wall, use the chemical planting method to plant tie bars. The specification of the tie bars is φ8. Greater than 150mm.

[0047] During the whole process, the single-sided concrete slab wall and the shear wall of the elevator shaft were poured integrally.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an additional elevator arranging and seismic reinforcement integral construction method for multi-storey houses. The additional elevator arranging and seismic reinforcement integral construction method is characterized by comprising steps of (1), additionally arranging elevator shafts with reinforced concrete shear walls at corresponding positions of outdoor stair halls or open yards of the existing multi-storey houses; (2), reinforcing the outer sides of peripheral walls of the multi-storey houses by the aid of wire mesh cement mortar surface layers or single-side concrete plate walls. The additional elevator arranging and seismic reinforcement integral construction method has the advantages that additional elevator arranging and seismic reinforcement requirements of the existing multi-storey houses can be simultaneously met, resource and energy wastage due to the fact that additional elevator arranging and seismic reinforcement requirements are individually met can be prevented, adverse impact of indoor construction and the like on residents and surrounding environments can be reduced, the structural safety and seismic performance can be effectively enhanced, and the additional elevator arranging and seismic reinforcement integral construction method can be widely used for seismic fortification zones for seism of 6-8 degrees; after additional elevator arranging and seismic reinforcement modification is carried out by the aid of the technical method, the integral seismic capacity of structures can be improved by one degree at least as compared with original unmodified structures, the rigidity and the ductility of the structures can be greatly improved, and brittle failure characteristics of the masonry structures are improved to a certain extent.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to an integrated construction method of adding elevators and anti-seismic reinforcement for multi-storey houses, which can achieve the purpose of improving the seismic strength of houses while adding elevators to existing multi-storey houses. Background technique [0002] At present, there are many multi-storey buildings in the 1980s and 1990s or even earlier in our country. Due to historical and construction technology reasons, many existing multi-storey residences do not have elevators. figure 1 As shown, it is not very convenient for residents living in high-rise buildings. At the same time, the earthquake resistance of these early buildings does not meet the requirements of modern buildings. With the economic development, the improvement of living standards and the aging of urban population, it is necessary to improve of these multi-storey buildings. At present...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G23/02E04B1/98
Inventor 蒋利学李向民王曙光蒋璐郑士举张富文
Owner SHANGHAI RES INST OF BUILDING SCI CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products