Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Anchor plate for construction and installation

An installation and anchor plate technology, applied in the direction of construction and building structure, can solve the problems of insufficient stability of screws and connecting holes, reduce steel bars, hidden safety hazards, etc., and achieve enhanced strength, high efficiency, and reduced work intensity. Effect

Active Publication Date: 2016-01-06
HANGZHOU STAN NEW MATERIALS TECH CO LTD
View PDF7 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, a deep space must be left on the steel surface of the concrete beam column for the T-shaped head anti-rotation block to sink and then rotate and pull out. The thickness of the existing groove-type embedded anchor is 25-35mm, forcing the surface of the steel bar to be concrete The protective layer exceeds the normal thickness (generally, the protective layer of the ribs is 20mm), causing problems such as squeezing the protective layer on the other side or reducing the ribs.
Moreover, the stability between the screw and the connecting hole is insufficient. After a certain number of building fluctuations (wind fluctuations, earthquake fluctuations), the gap between the screw and the connecting hole changes or the screw directly slips off, which has certain potential safety hazards.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anchor plate for construction and installation
  • Anchor plate for construction and installation
  • Anchor plate for construction and installation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0044] Embodiment 1, with reference to attached Figure 1-5 .

[0045] The present invention includes a concrete load-bearing connection point 1 for installing the anchor plate on the anchor plate 3 and a connecting hole 2 for connecting bolts for installing the secondary connecting piece, and the secondary connecting piece is generally a corner with a connecting hole Yards, on the secondary connectors to connect building structures such as keels. The anchor plate 3 is pre-embedded into the concrete foundation to realize fixing, and then the secondary connector and the anchor plate 3 are connected with the connecting bolt 4 .

[0046]The connection hole 2 is a multi-nodular long hole, and there are a plurality of continuous positioning holes 22 in the multi-nodular long hole. The large hole section 21 of the multi-nodular long hole is equipped with an embedded locking sleeve 5, and the locking sleeve 5 can be embedded in the positioning hole 22, and its outer peripheral surf...

Embodiment 2

[0055] Embodiment 2, with reference to Image 6 .

[0056] The concrete load-bearing connection point is a conjoined foot 50 fixedly connected with the anchor plate.

[0057] The conjoined feet 50 are formed by stamping and bending downwards of the steel plate of the anchor plate itself, which can be arranged at any position of the anchor plate, at each corner of the anchor plate or / and in the middle of the anchor plate. Secondly, using the stamped conjoined foot of the anchor plate's own steel plate can also save material, and at the same time pour concrete into the gap formed by the sinking of the conjoined foot on the anchor plate after being folded outward, which can further increase the bearing strength. The head of the conjoined foot 50 can protrude left and right, forming a barb effect, and strengthening the fixing performance after being embedded in concrete.

[0058] The connecting hole 2, the secondary connecting piece and its fixing method, and the locking sleeve ...

Embodiment 3

[0060] Embodiment 3, with reference to Figure 7 .

[0061] The concrete load-bearing connection point is a rod-shaped foot 51 connected to the anchor plate, such as a long screw rod, an anchor rod, and the like. The connecting hole, the secondary connecting piece and its fixing method, and the locking sleeve in this embodiment are the same as those in Embodiment 2.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an anchor plate for construction and installation. The anchor plate for construction and installation comprises a connecting hole, wherein the connecting hole is used for mounting a connecting bolt for a secondary connecting piece; the connecting bolt which is matched with the connecting hole when the secondary connecting piece is mounted comprises a head portion and a rod portion; the rod portion is matched with an inner hole of a locking sleeve; the diameter of the rod portion is smaller than the width of a narrowest position of a multi-node slot hole, so that the rod portion is suitable for freely sliding in the multi-node slot hole to adjust the position; after the locking sleeve sleeves the rod portion, the connecting bolt can be fixed in the multi-node slot hole along with the locking sleeve, and the locking sleeve and the connecting bolt are locked at a selected positioning hole site; and the head of the connecting bolt is clamped out of the positioning hole site. The connecting bolt can be placed in and taken out freely, conveniently and quickly, the position of the connecting bolt can be adjusted freely, conveniently and quickly, a mounting position can be quickly locked through the locking sleeve after the position is selected, workers can perform connection and fastening operation leisurely, welding reinforcement is not required, work intensity can be greatly reduced in a high altitude operation environment, and engineering quality is improved.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to an anchor plate and a construction installation structure for construction installation, which is suitable for installation within the thickness of the concrete protective layer of beam bolts in various buildings and various engineering constructions. Background technique [0002] China has now become the country that builds the most curtain walls in the world. The building curtain wall is the outer protective structure that uses the main building as the carrier. The main load of the building curtain wall is the anchor structure connected with the concrete. It not only bears the weight of the curtain wall, but also bears a series of external forces such as wind resistance and earthquakes. Bearing capacity requirements, its flexibility and simplicity are also crucial. [0003] Most of the existing anchor plates directly weld the screws, washers, and nuts connecti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/41
Inventor 徐跃华徐洁媛张清华周桂云
Owner HANGZHOU STAN NEW MATERIALS TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products